Thorndon Overbridge safety improvements

Complete replacement of more than 3km of existing crash barrier, with a new enhanced crash barrier system, together with new posts and anchoring along SH1 Thorndon Overbridge. The replacement extends to both Aotea Quay on and off Ramps and also includes improved barrier terminations at the bridge and ramp approaches.

All projects

Thorndon overbridge.

Thorndon overbridge

Wellington

  • Construction start date

    May 2010
  • Construction completion date

    May 2011
  • Location

    Thorndon
  • Project type

    Safety improvement
  • Project status

    Completed
  • Project contact

    Peter Martineau
  • Estimated cost

    $0 - $5M

Project purpose

To provide an enhanced crash barrier system thereby improving road user safety and vehicle containment along SH1 Thorndon Overbridge, and including Aotea Quay on and off ramps.

Benefits

  • Improved road user safety
  • Improved vehicle containment on Thorndon Overbridge
  • Improved debris protection to areas below the Thorndon Overbridge structure
  • Renewal of the existing crash barrier asset that is nearing its intended design life

Features

  • 'Nested Thriebeam' guardrail system - a custom design of crash barrier for Thorndon Overbridge
  • Mesh screens are being fitted below the crash barrier to prevent litter and debris falling from Thorndon Overbridge to areas below

Other facts

The new barrier system is similar to that installed on the recently completed Tauranga Second Harbour Bridge Crossing.