Decisions from the NLTP Review Group, October 2008

Download this table as a spreadsheet (Excel, 57 KB)

Review name Request type Work category Organisation name Project name Phase type Profile Decision Reason
Total cost change
NLTA share change
Condition
October Review New approval Bridge renewals Chatham Islands Council Owenga Wharf Development Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,660,000. 1,610,200.  
October Review New approval Bridge renewals Chatham Islands Council Owenga Wharf Development Design HMM Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request   61,100.  
October Review New approval Bridge renewals Hurunui District Council Bridge Renewals 2008/09 Block Programme Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 138,000. 82,800.  
October Review New approval Bridge renewals Rodney District Council Bridge replacement - Anderson No 2 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 250,000. 145,000.  
October Review New approval Bridge renewals Rodney District Council Bridge Replacement - Dyers Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 210,100. 121,858.  
October Review New approval Bridge renewals Rodney District Council Bridge Replacement - Pearmans Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 385,000. 223,300.  
October Review New approval Bridge renewals Selwyn District Council Lyndon Road Bridge Replacement Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 200,000. 116,000.  
October Review New approval Bus and ferry infrastructure Auckland Regional Transport Authority Ferry Terminal Upgrades - Birkenhead New Outer Berth Construction HHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 2,140,600. 1,284,360.  
October Review New approval Community advertising National Office Highway & Network Operations Use of Land Transport System - Community Advertising 08/09 Implementation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 500,000. 500,000.  
October Review New approval New roads and structures Canterbury Highway & Network Operations CHCH Northern Arterial Rural Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 3,000,000. 3,000,000.  
October Review New approval Passenger rail infrastructure Greater Wellington Stations - Platform, Buildings, Carparks and Security Construction HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 9,000,000. 8,100,000.  
October Review New approval Passenger transport road improvements Auckland City Council Bus Priority Investigations (2008/09) - Advanced fees Investigation MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 160,000. 84,800.  
October Review New approval Pedestrian facilities Waikato District Council Pedestrian Facilites 2008/09 - District Wide Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 410,455. 254,482.  
October Review New approval Preventive works National Office Highway & Network Operations Regional Projects 08/09 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 4,600,000. 4,600,000.  
October Review New approval Preventive works National Office Highway & Network Operations Rockfall Hazard Mitigation 08/09 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 400,000. 400,000.  
October Review New approval Preventive works Rodney District Council P/M 29 June 2008 : Puhoi & Wayby Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 195,000. 93,600.  
October Review New approval Preventive works Waikato District Council Ohautira Road preventative maintenance 2007/08 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 350,000. 182,000.  
October Review New approval Regional transport studies Nelson City Council Nelson-Tasman Corridor Study Model Update Study HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 57,000. 42,750.  
October Review New approval Road reconstruction Far North District Council Mangakahia Road 08_09 RP 20010 - 21410 (RDF) Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 388,999. 388,999.  
October Review New approval Road reconstruction Far North District Council Mangamuka Road 08_09 RP 1720 - 3220 (RDF) Construction MML Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request 1,043,250. 1,043,250. Approved by NZTA Board in paper 08/10/0077, subject to NLTP endorsement of the design statement and scope of work proposed.
October Review New approval Road reconstruction Far North District Council Waipapa Road Seal Widening plus W&C Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 4,340,000. 2,864,400.  
October Review New approval Road reconstruction Franklin District Council Road Reconstruction 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 520,000. 317,200.  
October Review New approval Road reconstruction Gisborne District Council Te Wereroa Road  [RD] Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 200,000. 200,000.  
October Review New approval Road reconstruction Gisborne District Council Waimata Valley Road STage 2 (RD) Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 4,600,000. 4,600,000.  
October Review New approval Road reconstruction Manukau City Council Road Reconstructions 2008-09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 6,300,000. 3,339,000.  
October Review New approval Road reconstruction North Shore City Council Pavement Reconstruction 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 783,500. 415,255.  
October Review New approval Road reconstruction Papakura District Council Pavement Reconstruction 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 945,000. 510,300.  
October Review New approval Road reconstruction Rodney District Council Pavement Smoothing 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 375,000. 217,500.  
October Review New approval Road reconstruction Waikato District Council Seddon Road Reconstruction Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 210,000. 130,200.  
October Review New approval Road reconstruction Waikato Highway & Network Operations East Taupo Arterial Design MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 50,000. 50,000.  
October Review New approval Road reconstruction Waimakariri District Council Flaxton Road / Fernside Road Intersection Improvements. Design HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 60,000. 35,400.  
October Review New approval Road reconstruction Waitakere City Council Great North Rd Pavment Reconstru- Section 2 (RP 3299 - 3640) Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 916,285. 485,631.  
October Review New approval Road reconstruction Whakatane District Council MacDonald Road Pavement Smoothing 08/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 142,500. 78,375.  
October Review New approval Road studies Nelson City Council Crash Reduction Studies Study HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 20,000. 15,000.  
October Review New approval Seal extension Far North District Council Kohukohu Road - Rp 13650 to 15120 (RDF) Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 900,000. 900,000.  
October Review New approval Seal extension Far North District Council Matai Bay Road Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 389,900. 257,334.  
October Review New approval Seal extension Far North District Council Sandhills Road RP 0 - 2400 m Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 453,800. 299,508.  
October Review New approval Seal extension Far North District Council Sandys Road RP 1400 - 2389 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 181,500. 119,790.  
October Review New approval Seal extension Far North District Council Wharau Road RP 1043-2043m Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 223,300. 147,378.  
October Review New approval Seal extension Kaipara District Council Baldrock Road (Stages 1 & 2) Seal Extension (R Fund) Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,995,000. 1,396,500.  
October Review New approval Seal extension Kaipara District Council Bickerstaffe Road Seal Extension 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 621,000. 434,700.  
October Review New approval Seal extension Whakatane District Council Manawahe Road Seal Extension 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 342,600. 188,430.  
October Review New approval Seal extension Whakatane District Council Ruatahuna Road (SPR) Seal Extension Yr 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 309,300. 231,975.  
October Review New approval System use studies Nelson City Council Travel Demand Outcomes from Corridor Study. Study HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 38,300. 28,725.  
October Review New approval - emergency works Emergency reinstatement Auckland Highway & Network Operations (E)Heavy Rainfall Auckland North July.08 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 3,395,800. 3,395,800.  
October Review New approval - emergency works Emergency reinstatement Auckland Highway & Network Operations (E)Newton Rd Westbound OffRamp Auckland July.08 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 620,000. 620,000.  
October Review New approval - emergency works Emergency reinstatement BOP Highway & Network Operations E/W 20080823 BOP East Late Aug 2-day storm event Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 118,300. 118,300.  
October Review New approval - emergency works Emergency reinstatement Kaikoura District Council Emergency Works 26 August 2008 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 347,273. 263,927.  
October Review New approval - emergency works Emergency reinstatement New Plymouth District Council Kaka Rd - Emergency Works RP5867 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 130,000. 67,600.  
October Review New approval - emergency works Emergency reinstatement Stratford District Council E/W Minor Events 07/08 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 80,000. 40,800.  
October Review New approval - emergency works Emergency reinstatement Tararua District Council E/Works 08/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 700,000. 490,000.  
October Review New approval - emergency works Emergency reinstatement Tasman Highway & Network Operations [E]  E/Works August 2008 Storm Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 324,500. 324,500.  
October Review New approval - emergency works Emergency reinstatement Thames-Coromandel District Council E/W Minor Events 2007-2008 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100,000. 46,000.  
October Review New approval - emergency works Emergency reinstatement Thames-Coromandel District Council E/W Minor Events 2008/2009 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,114,000. 512,440.  
October Review New approval - emergency works Emergency reinstatement Waitakere City Council 227 Forest Hill Road Slip Repair (Emergency Works) Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 170,000. 73,100.  
October Review New approval - emergency works Emergency reinstatement Whakatane District Council Matata May 2005 Event - Completion of Reinstatement Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 399,000. 179,550.  
October Review Cost / Scope adjustment Associated improvements Whakatane District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 113,000. 50,850.  
October Review Cost / Scope adjustment Bridge renewals Dunedin City Council Brighton Road Bridge Renewal Design MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Bridge renewals Marlborough District Council Bridge Replacement Programme 08/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Community coordination Rotorua District Council Road Safety & Sustainability Projects 2008/09 - coordination Implementation HHH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 50,000. 37,500.  
October Review Cost / Scope adjustment Community programmes Rotorua District Council Road Safety & Sustainability Projects 2008/09 Implementation HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 10,000. 7,500.  
October Review Cost / Scope adjustment Community programmes Timaru District Council Community Road Safety Programmes 2008/09 Implementation HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 15,000. 11,250.  
October Review Cost / Scope adjustment Cycle facilities Canterbury Highway & Network Operations Christchurch City Cycle Lanes SI Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment Cycle facilities Hawkes Bay Highway & Network Operations Hawkes Bay Cycling Strategy Investigation MLM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Cycle facilities Hawkes Bay Highway & Network Operations Waitangi Stream Bridge Cycleway Construction HHH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 49,900. 49,900.  
October Review Cost / Scope adjustment Drainage renewals Whakatane District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 313,000. 140,850.  
October Review Cost / Scope adjustment Emergency reinstatement Auckland Highway & Network Operations (E) South of Culvert 73 Auckland April 07 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Emergency reinstatement Auckland Highway & Network Operations [E]AHB Arch Truss Bridge Parapet Upgrade Auckland 14/09/05 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -800. -800.  
October Review Cost / Scope adjustment Emergency reinstatement Far North District Council E/W 21 February 2008 : Various sites Construction   Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 174,000.  
October Review Cost / Scope adjustment Emergency reinstatement Far North District Council E/W July 10 2007 : Various sites Construction   Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 115,050.  
October Review Cost / Scope adjustment Emergency reinstatement Kaipara District Council E/W 22 July 2007 : Various sites Construction   Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 312,589.  
October Review Cost / Scope adjustment Emergency reinstatement Manawatu/Wanganui Highway & Network Operations E/W West Wanganui 06/07 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -115,800. -115,800.  
October Review Cost / Scope adjustment Emergency reinstatement Manawatu/Wanganui Highway & Network Operations E/W West Wanganui SH4 Braeburn Riverbank Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Emergency reinstatement Marlborough Highway & Network Operations E/Works Marlborough 08/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 394,000. 394,000.  
October Review Cost / Scope adjustment Emergency reinstatement Northland Highway & Network Operations E/W July 2005 Storm Event: Various Sites (7) - Northland Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Emergency reinstatement Palmerston North City Council E/Works 2008/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 20,500. 9,430.  
October Review Cost / Scope adjustment Emergency reinstatement Tararua District Council E/Works 07/08 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 3,000.  
October Review Cost / Scope adjustment Emergency reinstatement Thames-Coromandel District Council E/W Minor Events 2007-2008 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100,000. -43,000.  
October Review Cost / Scope adjustment Emergency reinstatement Waikato District Council E/W Minor Events 2008/10 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 620,000. 328,600.  
October Review Cost / Scope adjustment Emergency reinstatement Waitomo District Council E/W Minor Events 2008/2009 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 194,350. 165,347.  
October Review Cost / Scope adjustment Emergency reinstatement Whangarei District Council E/W 10 July 2007 : Various sites Construction   Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 23,400.  
October Review Cost / Scope adjustment Emergency reinstatement Whangarei District Council E/W 28 July 2007 : Various sites Construction   Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 267,163.  
October Review Cost / Scope adjustment Emergency reinstatement Whangarei District Council E/W 28-29 March 2007 : Various sites Construction   Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 44,850.  
October Review Cost / Scope adjustment Level crossing warning devices Whangarei District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 17,500. 17,500.  
October Review Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Upper Harbour Bridge Duplication Stg 2 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Waiouru Connection I/C (MPP) Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Waterview Connection Investigation HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment New roads and structures BOP Highway & Network Operations Harbour Link Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 200. 200.  
October Review Cost / Scope adjustment New roads and structures Hawkes Bay Highway & Network Operations HB Expressway Southern Extension Investigation LHL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 2,600. 2,600.  
October Review Cost / Scope adjustment New roads and structures Waikato Highway & Network Operations Avalon Drive Bypass Construction HHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment New roads and structures Waikato Highway & Network Operations Cambridge Bypass (2L) Design HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment New roads and structures Waikato Highway & Network Operations Ngaruawahia Bypass Design HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment New roads and structures Waikato Highway & Network Operations Te Rapa Bypass Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment New roads and structures Wellington Highway & Network Operations Transmission  Gully Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment New roads and structures Wellington Highway & Network Operations Transmission Gully Investigation Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment Road reconstruction Auckland City Council Pavement Reconstruction 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Road reconstruction Auckland Highway & Network Operations AHB Storm Water Upgrade Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Road reconstruction Auckland Highway & Network Operations Greenlane East Interchange Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -400. -400.  
October Review Cost / Scope adjustment Road reconstruction Auckland Highway & Network Operations Te Atatu - Royal 6L Investigation HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Road reconstruction Auckland Highway & Network Operations Warkworth Stage 1 Design MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Road reconstruction BOP Highway & Network Operations Hewletts Flyover Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -70,000. -70,000.  
October Review Cost / Scope adjustment Road reconstruction BOP Highway & Network Operations Tauranga Eastern Motorway (TEM) Design MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Road reconstruction Hastings District Council Advance Investigation and Design Fees 08/09 Investigation MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1. 1.  
October Review Cost / Scope adjustment Road reconstruction Hastings District Council Omahu Road reconstruction Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Road reconstruction Hastings District Council Pavement Smoothing 08/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Road reconstruction Hawkes Bay Highway & Network Operations Matahorua Gorge Realignment Design MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment Road reconstruction Invercargill City Council Rockdale Road Reconstruction Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1. 1.  
October Review Cost / Scope adjustment Road reconstruction Manawatu/Wanganui Highway & Network Operations Ohingaiti-Makohine Realignment Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Road reconstruction Marlborough District Council Northbank Road - Stage 6 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Road reconstruction Northland Highway & Network Operations Akerama Curves Realign & PL Design MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment Road reconstruction Northland Highway & Network Operations Katetoke/Oakleigh Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -7,100. -7,100.  
October Review Cost / Scope adjustment Road reconstruction Otago Highway & Network Operations Tumai to Waikouaiti  Realignment Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Road reconstruction Queenstown-Lakes District Council Centennial Avenue Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 295,400. 156,562.  
October Review Cost / Scope adjustment Road reconstruction Taranaki Highway & Network Operations Rugby Road Underpass Construction HMM Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request 525,000. -9,160,000.  
October Review Cost / Scope adjustment Road reconstruction Waikato Highway & Network Operations Church to Avalon Drive Dr 4L Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Road reconstruction Waikato Highway & Network Operations Mangatawhiri Township Deviat'n Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Road reconstruction Wellington Highway & Network Operations Mackays Crossing Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100. 100.  
October Review Cost / Scope adjustment Road reconstruction Wellington Highway & Network Operations Rimutaka Corner Easing (Muldoon's) Design MMM Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request 90,000. 90,000. Additional design funds approved subject to a report to the Review Group setting out the rationale and justification for adoption of a 10million seal width for whole Rimutaka Hill
October Review Cost / Scope adjustment Road reconstruction Wellington Highway & Network Operations SH2/58 Grade Separation Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 45,500. 45,500.  
October Review Cost / Scope adjustment Road reconstruction Whangarei District Council Mangakahia Road 2008/09 (RDF) Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Seal extension Hastings District Council Crownthorpe Settlement Road Seal Extension - Route Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Seal extension Hastings District Council Hawkston Road Seal Extension - Route Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Seal extension Hastings District Council Waikoau Road Seal Extension - Route Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Seal extension Kaipara District Council Bridge Approach Sealing 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Seal extension Kaipara District Council Intersection Safety Sealing 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Cost / Scope adjustment Seal extension Northland Highway & Network Operations Waitiki Landing to Cape Reinga SE Stg 2 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -100. -100.  
October Review Cost / Scope adjustment Seal extension Queenstown-Lakes District Council Orchard Road Seal Extension Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 0.  
October Review Withdraw activity Emergency reinstatement Nelson Highway & Network Operations E/W Motupiko Flood Damage Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -101,000. -101,000.  
October Review Withdraw activity Emergency reinstatement Waikato Highway & Network Operations E/W June - July 2007 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -390,000. -390,000.