Download this table as a spreadsheet (Excel, 44 KB)
| Review name | Request type | Work category | Organisation name | Project name | Phase type | Profile | Decision | Reason | Total cost change |
NLTA share change |
Condition |
|---|---|---|---|---|---|---|---|---|---|---|---|
| November Review | New approval | Bus and ferry infrastructure | Greater Wellington | Real Time Passenger Information System | Construction | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 10,850,000. | 8,680,000. | |
| November Review | New approval | Community programmes | Queenstown-Lakes District Council | QLDC Travel Demand Management Plans 2008/09 | Implementation | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 30,000. | 22,500. | |
| November Review | New approval | Cycle facilities | Auckland City Council | Waikaraka Cycleway and Onehunga Cycling Improvements | Construction | HHL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 546,150. | 289,460. | |
| November Review | New approval | Cycle facilities | Palmerston North City Council | Cycle facilities 2008/09 | Construction | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 400,000. | 224,000. | |
| November Review | New approval | Cycle facilities | Rotorua District Council | CBD To Ngongotaha Cycling Route | Construction | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 900,000. | 504,000. | |
| November Review | New approval | Cycle facilities | Wellington Highway & Network Operations | Petone to Ngauranga Cycleway Interim Safety Improvements | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 680,000. | 680,000. | |
| November Review | New approval | Cycle facilities | Wellington Highway & Network Operations | Petone to Ngauranga Cycleway Safety | Investigation | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 40,000. | 40,000. | |
| November Review | New approval | New roads and structures | Hamilton City Council | Old Wairere Drive - Pukete to Resolution 4 laning | Design | MMH | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 1,950,000. | 1,072,500. | Prior to an application being made for construction funding, Hamilton CC must review the project for consistency against the strategic objectives of the revised Access Hamilton strategy. |
| November Review | New approval | Passenger transport road improvements | Auckland City Council | 2009-12 Sandringham Rd Corridor project | Design | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 593,000. | 314,290. | |
| November Review | New approval | Pedestrian facilities | Waitakere City Council | School Travel Plans for Te Atatu South 08/09 | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 851,000. | 451,030. | |
| November Review | New approval | Preventive works | Auckland City Council | Cliff Rd St Helliers Pallisade Wall Protection Works Stage 2 | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,900,000. | 817,000. | |
| November Review | New approval | Preventive works | Otago Highway & Network Operations | Nevis Bluff P5 Rock Removal | Construction | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 964,000. | 964,000. | |
| November Review | New approval | Preventive works | Porirua City Council | Preventive Maint - Paekakriki Hill Road | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 263,000. | 115,720. | |
| November Review | New approval | Preventive works | Rodney District Council | Preventive Maintenance - Forestry Road Slip | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 49,670. | 23,842. | |
| November Review | New approval | Preventive works | Waitakere City Council | Tanekaha Road Slip Repair | Construction | MMH | Approved in part | The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined because the requirements of section 20 of the LTMA have not been met or deferred for late | 168,200. | 43,000. | |
| November Review | New approval | Regional transport studies | Waipa District Council | Integrated Transport Strategy 2008/9 rev1 | Study | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 165,000. | 123,750. | |
| November Review | New approval | Road reconstruction | Rotorua District Council | Malfroy/Ranolf Roundabout | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,333,000. | 746,480. | |
| November Review | New approval | Road reconstruction | Whangarei District Council | Pavement Smoothing 2008/09 | Construction | MMH | Approved in part | The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined because the requirements of section 20 of the LTMA have not been met or deferred for late | 2,290,000. | 1,419,800. | |
| November Review | New approval | Road studies | North Shore City Council | Albany Highway Corridor Study | Investigation | HHL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 325,000. | 243,750. | |
| November Review | New approval | Road studies | Waitakere City Council | Waitakere Central City Traffic Modelling - | Investigation | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 275,000. | 206,250. | |
| November Review | New approval | Seal extension | DOC (Hokitika) | Fox Glacier North Access Road Seal Extension | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,100,000. | 1,100,000. | |
| November Review | New approval | Seal extension | DOC (Hokitika) | Franz Josef Glacier Access Road Seal Extension | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,400,000. | 1,400,000. | |
| November Review | New approval | Seal extension | Kaipara District Council | Awakino Point East Road Stage 1 (R Fund) | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 270,000. | 189,000. | |
| November Review | New approval | Seal extension | Kaipara District Council | Awakino Point East Road Stage 2 | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 214,860. | 150,402. | |
| November Review | New approval | Seal extension | North Shore City Council | Elmore Road Seal Extension | Construction | MMH | Approved in part | The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined because the requirements of section 20 of the LTMA have not been met or deferred for late | 420,000. | 222,600. | |
| November Review | New approval | Seal extension | Tasman District Council | Bridge Valley Road Seal Extension Stage 2 | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 145,000. | 85,550. | |
| November Review | New approval | Super gold card | Environment Canterbury | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,278,000. | 1,278,000. | |
| November Review | New approval | Super gold card | Hawkes Bay Regional Council | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 57,000. | 57,000. | |
| November Review | New approval | Super gold card | Horizons Manawatu | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 119,000. | 119,000. | |
| November Review | New approval | Super gold card | Invercargill City Council | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 56,000. | 56,000. | |
| November Review | New approval | Super gold card | Marlborough District Council | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 8,000. | 8,000. | |
| November Review | New approval | Super gold card | Nelson City Council | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 22,000. | 22,000. | |
| November Review | New approval | Super gold card | Otago Regional Council | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 245,000. | 245,000. | |
| November Review | New approval | Super gold card administration | Environment Canterbury | Supergold Card Administration Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 90,000. | 90,000. | |
| November Review | New approval | Super gold card administration | Hawkes Bay Regional Council | Supergold Card Administration Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 13,000. | 13,000. | |
| November Review | New approval | Super gold card administration | Horizons Manawatu | Supergold Card Administration Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 23,000. | 23,000. | |
| November Review | New approval | Super gold card administration | Invercargill City Council | Supergold Card Administration Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 13,000. | 13,000. | |
| November Review | New approval | Super gold card administration | Marlborough District Council | Supergold Card Administration Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 4,000. | 4,000. | |
| November Review | New approval | Super gold card administration | Nelson City Council | Supergold Card Administration Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 7,000. | 7,000. | |
| November Review | New approval | Super gold card administration | Otago Regional Council | Super Gold Card Administration | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 60,000. | 60,000. | |
| November Review | New approval | System use studies | Auckland City Council | CBD PT Integration | Study | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 485,000. | 363,750. | |
| November Review | New approval | System use studies | Waitomo District Council | Waitomo Walking & Cycling | Study | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 20,000. | 15,000. | |
| November Review | New approval - emergency works | Emergency reinstatement | BOP Highway & Network Operations | E/W 20081015 SH2 Waioeka Gorge Sandys Bridge RP345/9.30 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 170,000. | 170,000. | ||
| November Review | New approval - emergency works | Emergency reinstatement | Queenstown-Lakes District Council | EW 08/09 August 2008 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 142,000. | 82,360. | ||
| November Review | New approval - emergency works | Emergency reinstatement | South Taranaki District Council | Minor event - September 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 210,000. | 107,100. | ||
| November Review | New approval - emergency works | Emergency reinstatement | South Wairarapa District Council | Emergency Works - July 2008 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 150,000. | 73,500. | ||
| November Review | New approval - emergency works | Emergency reinstatement | Southland Highway & Network Operations | E/W Underwood slip 3 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 155,000. | 155,000. | ||
| November Review | New approval - emergency works | Emergency reinstatement | Waikato Highway & Network Operations | E/W CW SH30 Ongaroto Road Rockfall | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 60,000. | 60,000. | ||
| November Review | Cost / Scope adjustment | Bridge renewals | West Coast Highway & Network Operations | Arahura BR | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -224,100. | -224,100. | |
| November Review | Cost / Scope adjustment | Bridge renewals | West Coast Highway & Network Operations | Arahura BR | Design | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -27,100. | -27,100. | |
| November Review | Cost / Scope adjustment | Community coordination | Nelson City Council | Road Safety and Travel planning co-ordination | Implementation | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 120,000. | 90,000. | |
| November Review | Cost / Scope adjustment | Cycle facilities | Otago Highway & Network Operations | Adderly Tce to De Lacy St Cycling Impr. | Construction | HHL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 35,000. | 35,000. | |
| November Review | Cost / Scope adjustment | Cycle facilities | Waikato Highway & Network Operations | Massey Street Cycle Lane | Design | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 21,300. | 21,300. | |
| November Review | Cost / Scope adjustment | Drainage renewals | Waitaki District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 69,000. | 39,330. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | DOC (Manawatu-Wanganui) | E/Works 2008/09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 8,000. | 8,000. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | Manawatu District Council | E/Works 08/09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 846,348. | 452,564. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | Manukau City Council | E/W July 2008 : Various sites | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 5,196,000. | 2,288,790. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | New Plymouth District Council | Emergency Work Programme 08/09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 5,100. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | New Plymouth District Council | Ngatoto Road North | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 1,750. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | South Taranaki District Council | Emergency work - minor event July 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 1,500. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | Southland District Council | Papatotara Coast Storm Damage | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 750,000. | 412,500. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | Waipa District Council | Storm Event August 2008 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 250,000. | 125,500. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | Waitomo District Council | E/W Minor Events 2008/2009 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 85,200. | 61,344. | ||
| November Review | Cost / Scope adjustment | Emergency reinstatement | Western BoP District Council | Emergency Works 2008 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 58,000. | 26,100. | ||
| November Review | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | ALPURT - Sector B2 Toll Road | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 12,128,300. | 12,128,300. | |
| November Review | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | Central Motorway Junction, Stage 2 | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 100. | 100. | |
| November Review | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | Mt Roskill Extension | Construction | MMM | Approved in part | The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined because the requirements of section 20 of the LTMA have not been met or deferred for late | 7,350,000. | 7,350,000. | |
| November Review | Cost / Scope adjustment | New roads and structures | Canterbury Highway & Network Operations | Christchurch Southern Motorway Extension (Master) | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 0. | |
| November Review | Cost / Scope adjustment | New roads and structures | Canterbury Highway & Network Operations | Christchurch Southern Motorway Extension (Master) | Design | LML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,174,100. | 1,174,100. | |
| November Review | Cost / Scope adjustment | New roads and structures | Hawkes Bay Highway & Network Operations | HB Expressway Southern Extension | Investigation | LHL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 89,200. | 89,200. | |
| November Review | Cost / Scope adjustment | New roads and structures | Tasman Highway & Network Operations | Ruby Bay Bypass A | Construction | LML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 23,000. | 4,926. | |
| November Review | Cost / Scope adjustment | New roads and structures | Tasman Highway & Network Operations | Ruby Bay Bypass A | Design | LML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -23,000. | -23,000. | |
| November Review | Cost / Scope adjustment | Road reconstruction | Auckland Highway & Network Operations | Kopuku Realignment | Investigation | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 0. | |
| November Review | Cost / Scope adjustment | Road reconstruction | BOP Highway & Network Operations | Tauranga Central Corridor Improvements Stage 2 | Design | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 2,100. | 2,100. | |
| November Review | Cost / Scope adjustment | Road reconstruction | BOP Highway & Network Operations | Tauranga Central Corridor Improvements Stage 2 | Investigation | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -2,100. | -2,100. | |
| November Review | Cost / Scope adjustment | Road reconstruction | Dunedin City Council | Harrington Point Rd - Poo Corner Widening / Realignment | Construction | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 206,247. | 134,061. | |
| November Review | Cost / Scope adjustment | Road reconstruction | Dunedin City Council | Portobello Road Widening: Rosehill Road to Raynbird Street. | Construction | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,356,203. | 881,532. | |
| November Review | Cost / Scope adjustment | Road reconstruction | Franklin District Council | Road Reconstruction 2008/09 | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,076,431. | 656,623. | |
| November Review | Cost / Scope adjustment | Road reconstruction | Hawkes Bay Highway & Network Operations | Waipukurau Overbridge Realignment | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 0. | |
| November Review | Cost / Scope adjustment | Road reconstruction | North Shore City Council | Onewa Road (Lake to Sylvan) 06/07 | Design | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 0. | |
| November Review | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | SH2/58 Grade Separation | Investigation | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 60,500. | 60,500. | |
| November Review | Cost / Scope adjustment | Seal extension | Rangitikei District Council | Taihape Napier Road Seal Extension (R) | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 0. | |
| November Review | Cost / Scope adjustment | Seal extension | Waimakariri District Council | Boundary Road Seal Extension 08/09 | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -50,000. | -68,075. | |
| November Review | Cost / Scope adjustment | Seal extension | Whangarei District Council | Glenmohr Rd SE Stg 2 07/08 | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 210,000. | 130,200. | |
| November Review | Cost / Scope adjustment | Seal extension | Whangarei District Council | Kaiatea Rd SE P2 08/09 (R Fund) | Construction | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -210,000. | -130,200. | |
| November Review | Cost / Scope adjustment | Sealed road resurfacing | Queenstown-Lakes District Council | Maintenance Programme 2008/09 | Crown Range | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 98,000. | 88,200. | ||
| November Review | Cost / Scope adjustment | Structures component replacements | Waitaki District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 210,000. | 119,700. | ||
| November Review | Cost / Scope adjustment | System use studies | Hawkes Bay Highway & Network Operations | Strategic Studies - Hawkes Bay | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 100. | 100. |