NZTA logo.

Decisions from the NLTP Review Group, February 2009

Download this table as a spreadsheet (Excel, 64 KB)

Review Name Request Type Work category Org Name Project Name Phase Type Profile Decision Reason
Total cost change
NLTA share change
Condition
February Review Cost / Scope adjustment Advance property purchase Far North District Council Kerikeri Heritage Bypass (LP) Construction MHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-64,678.
-48,509.
 
February Review Cost / Scope adjustment Associated improvements Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
31,960.
13,742.8
 
February Review Cost / Scope adjustment Associated improvements South Taranaki District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
150,000.
75,000.
 
February Review Cost / Scope adjustment Associated improvements Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
20,001.
9,600.48
 
February Review Cost / Scope adjustment Associated improvements Waitomo District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-130,000.
-75,400.
 
February Review Cost / Scope adjustment Bridge renewals Auckland Highway & Network Operations Newmarket Viaduct Construction HHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
14,540,000.
14,540,000.
 
February Review Cost / Scope adjustment Community coordination Auckland City Council Workplace Travel Plan CFA 2008/09 - Auckland City Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-132,500.
-99,375.
 
February Review Cost / Scope adjustment Community programmes Auckland City Council Community Programme (2007/08) Implementation   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-363,464.
-272,598.
 
February Review Cost / Scope adjustment Community programmes Auckland City Council Community Programme (2008/09) Implementation HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-248,750.
-186,563.
 
February Review Cost / Scope adjustment Community programmes Auckland City Council Workplace Travel Plan CFA 2008/09 - Auckland City Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-50,000.
-37,500.
 
February Review Cost / Scope adjustment Community programmes Dunedin City Council 2008/2009 Community Focused Activities Cat 432 Implementation HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
13,700.
10,275.
 
February Review Cost / Scope adjustment Cycle facilities Hutt City Council (Old) Eastern Bays Cycleway/Walkway Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-10,000.
-5,700.
 
February Review Cost / Scope adjustment Cycle facilities Manukau City Council Cycle Routes 2008/09 (Smales Road) Construction HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-19,080.
-10,112.
 
February Review Cost / Scope adjustment Cycle facilities Wellington Highway & Network Operations Petone to Ngauranga Cycleway Interim Safety Improvements Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
200,000.
200,000.
 
February Review Cost / Scope adjustment Cycle path maintenance Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
491.
211.13
 
February Review Cost / Scope adjustment Drainage renewals Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
23,951.
10,298.93
 
February Review Cost / Scope adjustment Drainage renewals Queenstown-Lakes District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
22,100.
9,503.
 
February Review Cost / Scope adjustment Drainage renewals Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
46,000.
22,080.
 
February Review Cost / Scope adjustment Emergency reinstatement DOC (Hokitika) Fox Glacier Causeway Emergency Works Nov 08 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
70,000.
70,000.
 
February Review Cost / Scope adjustment Emergency reinstatement Far North District Council E/W 21 February 2008 : Various sites Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-500,000.
-425,000.
 
February Review Cost / Scope adjustment Emergency reinstatement Far North District Council E/W 26th-28th July 2008 : Various sites Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
0.
-439,060.
 
February Review Cost / Scope adjustment Emergency reinstatement Far North District Council E/W 29 April 2008 : Various sites Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-190,000.
-161,500.
 
February Review Cost / Scope adjustment Emergency reinstatement Hauraki District Council Emergency Works - July 2008 Event Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-21,000.
-11,340.
 
February Review Cost / Scope adjustment Emergency reinstatement Hawkes Bay Highway & Network Operations E/W Hawkes Bay Storm Restoration 2008/SH5 Dillons Hill Fld Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
400,000.
400,000.
 
February Review Cost / Scope adjustment Emergency reinstatement Kaipara District Council E/W 26th-30th July 2008 : Various sites Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-2,000,000.
-1,820,000.
 
February Review Cost / Scope adjustment Emergency reinstatement Manawatu/Wanganui Highway & Network Operations E/W East Wanganui July & August 2008 Storm Events Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
171,500.
171,500.
 
February Review Cost / Scope adjustment Emergency reinstatement Manawatu/Wanganui Highway & Network Operations E/W West Wanganui SH4 Braeburn Riverbank Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
1,280,900.
1,280,900.
 
February Review Cost / Scope adjustment Emergency reinstatement Marlborough District Council E/Works 08/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
600,000.
360,000.
 
February Review Cost / Scope adjustment Emergency reinstatement Porirua City Council E/Works 08/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
250,000.
110,000.
 
February Review Cost / Scope adjustment Emergency reinstatement Ruapehu District Council E/Works 08/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
861,000.
839,710.
 
February Review Cost / Scope adjustment Emergency reinstatement Southland District Council Stewart Island 2007 Storm Damage Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
0.
-6,000.
 
February Review Cost / Scope adjustment Emergency reinstatement Tararua District Council E/Works 08/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
320,000.
234,200.
 
February Review Cost / Scope adjustment Emergency reinstatement Waikato District Council E/W Minor Events 2008/10 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-180,000.
-104,400.
 
February Review Cost / Scope adjustment Emergency reinstatement Waikato Highway & Network Operations E/W [E]08/012/3Tangitu Underslip Construction   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
350,000.
350,000.
 
February Review Cost / Scope adjustment Emergency reinstatement Wairoa District Council Emergency Works. 2008/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
200,000.
178,000.
 
February Review Cost / Scope adjustment Emergency reinstatement Waitakere City Council E/W July & Aug 2008 : Various sites Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
152,044.
65,379.
 
February Review Cost / Scope adjustment Emergency reinstatement Waitomo District Council E/W Minor Events 2008/2009 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
429,719.
309,397.
 
February Review Cost / Scope adjustment Environmental maintenance Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
5,847.
2,514.21
 
February Review Cost / Scope adjustment Environmental maintenance Queenstown-Lakes District Council Maintenance Programme 2008/09 Crown Range   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-111,000.
-99,900.
 
February Review Cost / Scope adjustment Environmental maintenance Taupo District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
80,000.
34,400.
 
February Review Cost / Scope adjustment Environmental maintenance Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
20,000.
9,600.
 
February Review Cost / Scope adjustment Environmental renewals Queenstown-Lakes District Council Maintenance Programme 2008/09 Crown Range   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-10,000.
-9,000.
 
February Review Cost / Scope adjustment Level crossing warning devices Western BoP District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
8,000.
8,000.
 
February Review Cost / Scope adjustment Minor improvements Hutt City Council Minor improvements 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-245,080.
-139,696.
 
February Review Cost / Scope adjustment Minor improvements Upper Hutt City Council Minor improvements 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-130,000.
-71,500.
 
February Review Cost / Scope adjustment Minor improvements Wairoa District Council Minor improvements 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-165,000.
-125,400.
 
February Review Cost / Scope adjustment Network and asset management Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
728,889.
313,422.27
 
February Review Cost / Scope adjustment Network and asset management Chatham Islands Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
41,000.
35,670.
 
February Review Cost / Scope adjustment Network and asset management Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
-13,000.
-6,240.
 
February Review Cost / Scope adjustment Network and asset management Waitaki District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
134,400.
76,608.
 
February Review Cost / Scope adjustment Network and asset management Western BoP District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
135,000.
60,750.
 
February Review Cost / Scope adjustment New roads and structures Canterbury Highway & Network Operations Christchurch Southern Motorway Extension (Master) Construction MMM Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
174,690,000.
174,690,000.
Subject to confirmation that the Canterbury Regional Transport Cttee agrees to the increased allocation of "R" funds to the project.
February Review Cost / Scope adjustment New roads and structures Hawkes Bay Highway & Network Operations HB Expressway Southern Extension Investigation LHL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
75,000.
75,000.
 
February Review Cost / Scope adjustment New roads and structures Manukau City Council Waiouru Peninsula to SH1 (MPP) Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-1,400,000.
-742,000.
 
February Review Cost / Scope adjustment New roads and structures Northland Highway & Network Operations Kamo Bypass Stage 2 Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-47,500.
-47,500.
 
February Review Cost / Scope adjustment New roads and structures West Coast Highway & Network Operations Gates of Haast Realign Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-154,800.
-154,800.
 
February Review Cost / Scope adjustment Operational traffic management Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
56,400.
24,252.
 
February Review Cost / Scope adjustment Passenger rail infrastructure Greater Wellington Stations - Platform, Buildings, Carparks and Security Construction HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
4,000,000.
3,600,000.
 
February Review Cost / Scope adjustment Passenger rail infrastructure Greater Wellington z Trains - English Electric EMU Refurbishment Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-208,098.
-124,859.
 
February Review Cost / Scope adjustment Passenger transport road improvements Auckland City Council Central Transit Corridor  (Construction) Construction HHL Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
1,140,000.
604,200.
Subject to confirmation that:

1) procurement of the additional work is as per an approved procedure; and

2) project timing remains as planned at time of construction approval.
February Review Cost / Scope adjustment Pavement rehabilitation Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
8,667.
3,726.81
 
February Review Cost / Scope adjustment Pavement rehabilitation Queenstown-Lakes District Council Maintenance Programme 2008/09 Crown Range   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
441,000.
396,900.
 
February Review Cost / Scope adjustment Pavement rehabilitation Queenstown-Lakes District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-273,100.
-117,433.
 
February Review Cost / Scope adjustment Pavement rehabilitation Queenstown-Lakes District Council Maintenance Programme 2008/09 SPR   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-258,000.
-258,000.
 
February Review Cost / Scope adjustment Pavement rehabilitation South Taranaki District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
765,000.
382,500.
 
February Review Cost / Scope adjustment Pavement rehabilitation Upper Hutt City Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
106,400.
47,880.
 
February Review Cost / Scope adjustment Pavement rehabilitation Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
14,000.
6,720.
 
February Review Cost / Scope adjustment Pavement rehabilitation Waitomo District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-250,000.
-145,000.
 
February Review Cost / Scope adjustment Pedestrian facilities Dunedin City Council 2008 / 2009 Walking Facilities Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-22,000.
-14,300.
 
February Review Cost / Scope adjustment Pedestrian facilities North Shore City Council Travelwise to School Programme Construction LML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-526,110.
-278,838.
 
February Review Cost / Scope adjustment Property purchase (local roads) North Shore City Council Esmonde Rd Widening 2004/05 (LP) Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-1,223,390.
-648,397.
 
February Review Cost / Scope adjustment Property purchase (state highways) National Office Highway & Network Operations State Highway Property 08/09 (N) Construction LML Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
5,500,000.
5,500,000.
To be considered as an advance of forward years allocation
February Review Cost / Scope adjustment Road reconstruction Auckland City Council Church St / Captain Springs Rd Improvements Investigation HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-250,000.
-132,500.
 
February Review Cost / Scope adjustment Road reconstruction Auckland City Council Tiverton Rd/Wolverton St Route Upgrade Construction HMH Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
0.
0.
 
February Review Cost / Scope adjustment Road reconstruction Auckland Highway & Network Operations Vic Park Tunnel Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-244,300.
-244,300.
 
February Review Cost / Scope adjustment Road reconstruction BOP Highway & Network Operations Hewletts Flyover Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-367,700.
-367,700.
 
February Review Cost / Scope adjustment Road reconstruction BOP Highway & Network Operations Tauranga Eastern Motorway (TEM) Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-22,100.
-22,100.
 
February Review Cost / Scope adjustment Road reconstruction Dunedin City Council Harington Point Road: Widening Tily St  - Weir Rd Construction HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-202,400.
-131,560.
 
February Review Cost / Scope adjustment Road reconstruction Far North District Council Mangamuka Road 08_09 RP 1720 - 3220 (RDF) Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-243,250.
-243,250.
 
February Review Cost / Scope adjustment Road reconstruction Far North District Council Waipapa Road Seal Widening plus W&C Construction LMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-390,000.
-257,400.
 
February Review Cost / Scope adjustment Road reconstruction Gisborne District Council East Cape Road Upgrading (RD) Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-634,248.
-634,248.
 
February Review Cost / Scope adjustment Road reconstruction Manukau City Council Beachlands / Whitford - Maraetai Intersection Improvements Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-376,000.
-199,280.
 
February Review Cost / Scope adjustment Road reconstruction Manukau City Council Beachlands / Whitford - Maraetai Intersection Improvements Design HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-70,000.
-37,100.
 
February Review Cost / Scope adjustment Road reconstruction Manukau City Council Flat Bush - Ormiston Murphys Int. and Ormiston East Bridge Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-2,331,146.
-1,235,507.
 
February Review Cost / Scope adjustment Road reconstruction North Shore City Council Bus Priority Measures Investigation HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-366,950.
-282,551.
 
February Review Cost / Scope adjustment Road reconstruction North Shore City Council Constellation Drive Transit and Cycle Lanes Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-10,723.
-5,684.
 
February Review Cost / Scope adjustment Road reconstruction North Shore City Council Esmonde Rd Widening 2004/05 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-166,757.
-88,381.
 
February Review Cost / Scope adjustment Road reconstruction North Shore City Council Forrest Hill Transit and Cycle Lanes 06/07 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-105,341.
-55,831.
 
February Review Cost / Scope adjustment Road reconstruction North Shore City Council Glendhu Rd Upgrading & Link 06/07 Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-188,064.
-99,674.
 
February Review Cost / Scope adjustment Road reconstruction North Shore City Council Lake Road Widening 06/07 Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-20,400.
-10,812.
 
February Review Cost / Scope adjustment Road reconstruction Taranaki Highway & Network Operations Normanby Overbridge Realignment Design MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
92,400.
92,400.
 
February Review Cost / Scope adjustment Road reconstruction Waikato Highway & Network Operations Church to Avalon Drive Dr 4L Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-250,000.
-250,000.
 
February Review Cost / Scope adjustment Road reconstruction Wairoa District Council Kumi Road (RDR) Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-18,030.
-18,030.
 
February Review Cost / Scope adjustment Road reconstruction Wairoa District Council Patunamu/Ruapapa Road(RDR) Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-40,868.
-40,868.
 
February Review Cost / Scope adjustment Road reconstruction Whakatane District Council MacDonald Road Pavement Smoothing 08/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
38,340.
21,087.
 
February Review Cost / Scope adjustment Road reconstruction Whangarei District Council Mangakahia Road 2008/09 (RDF) Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-1,000,000.
-1,000,000.
 
February Review Cost / Scope adjustment Road studies DOC (Hokitika) Fox Glacier North Road - Undersite Slip Monitoring Study MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
5,000.
5,000.
 
February Review Cost / Scope adjustment Road studies North Shore City Council Waitemata Harbour Crossing Study HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-30,529.
-16,180.
 
February Review Cost / Scope adjustment Routine drainage maintenance Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
33,299.
14,318.57
 
February Review Cost / Scope adjustment Routine drainage maintenance Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
40,000.
19,200.
 
February Review Cost / Scope adjustment Seal extension DOC (Hokitika) Fox Glacier North Access Road Seal Extension Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
208,000.
208,000.
 
February Review Cost / Scope adjustment Seal extension DOC (Hokitika) Franz Josef Glacier Access Road Seal Extension Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
141,000.
141,000.
 
February Review Cost / Scope adjustment Seal extension Far North District Council Sandhills Road RP 0 - 2400 m Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-75,900.
-50,094.
 
February Review Cost / Scope adjustment Seal extension Far North District Council Sandys Road RP 1400 - 2389 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-36,500.
-24,090.
 
February Review Cost / Scope adjustment Seal extension Whangarei District Council Kaiatea Rd SE P2 08/09 (R Fund) Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-200,000.
-124,000.
 
February Review Cost / Scope adjustment Sealed pavement maintenance Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
99,561.
42,811.23
 
February Review Cost / Scope adjustment Sealed pavement maintenance Queenstown-Lakes District Council Maintenance Programme 2008/09 Crown Range   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-123,000.
-110,700.
 
February Review Cost / Scope adjustment Sealed pavement maintenance Taupo District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
150,000.
64,500.
 
February Review Cost / Scope adjustment Sealed pavement maintenance Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
92,001.
44,160.48
 
February Review Cost / Scope adjustment Sealed pavement maintenance Western BoP District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
963,333.
433,499.85
 
February Review Cost / Scope adjustment Sealed road resurfacing Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
133,236.
57,291.48
 
February Review Cost / Scope adjustment Sealed road resurfacing Queenstown-Lakes District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-486,000.
-208,980.
 
February Review Cost / Scope adjustment Sealed road resurfacing Queenstown-Lakes District Council Maintenance Programme 2008/09 SPR   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
58,000.
58,000.
 
February Review Cost / Scope adjustment Sealed road resurfacing South Taranaki District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
330,000.
165,000.
 
February Review Cost / Scope adjustment Sealed road resurfacing Taupo District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
120,000.
51,600.
 
February Review Cost / Scope adjustment Sealed road resurfacing Waitomo District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-100,000.
-58,000.
 
February Review Cost / Scope adjustment Structures component replacements Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
2,980.
1,281.4
 
February Review Cost / Scope adjustment Structures component replacements Mackenzie District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
91,000.
49,140.
 
February Review Cost / Scope adjustment Structures component replacements Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
-130,000.
-62,400.
 
February Review Cost / Scope adjustment Structures maintenance Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
12,694.
5,458.42
 
February Review Cost / Scope adjustment Structures maintenance Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
-92,000.
-44,160.
 
February Review Cost / Scope adjustment Traffic services maintenance Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
98,459.
42,337.37
 
February Review Cost / Scope adjustment Traffic services maintenance Queenstown-Lakes District Council Maintenance Programme 2008/09 Crown Range   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
-17,000.
-15,300.
 
February Review Cost / Scope adjustment Traffic services maintenance Taupo District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
8,000.
3,440.
 
February Review Cost / Scope adjustment Traffic services maintenance Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
-77,000.
-36,960.
 
February Review Cost / Scope adjustment Traffic services renewals Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
90,353.
38,851.79
 
February Review Cost / Scope adjustment Traffic services renewals Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
50,000.
24,000.
 
February Review Cost / Scope adjustment Unsealed pavement maintenance Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
10,722.
4,610.46
 
February Review Cost / Scope adjustment Unsealed pavement maintenance Waipa District Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
30,000.
14,400.
 
February Review Cost / Scope adjustment Unsealed road metalling Auckland City Council Maintenance Programme 2008/09 Local Roads   Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late
9,823.
4,223.89
 
February Review New approval Bridge renewals Auckland Highway & Network Operations Punganui Stream Bridge Replacement Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
6,600,000.
6,600,000.
 
February Review New approval Bridge renewals Chatham Islands Council Whangatete Bridge Renewal (T funds) Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
473,700.
459,489.
 
February Review New approval Bridge renewals Chatham Islands Council Whangatete Bridge Renewal (T funds) Design MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
30,000.
29,100.
 
February Review New approval Bridge renewals Clutha District Council Bridge #241 Replacement Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
165,000.
115,500.
 
February Review New approval Bridge renewals Clutha District Council Bridge #32 Replacement Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
174,000.
121,800.
 
February Review New approval Bridge renewals Ruapehu District Council Mountain Road (SPR) Bridge at 9 km Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
1,150,000.
862,500.
 
February Review New approval Bridge renewals Waikato Highway & Network Operations Kopu Bridge Replacement (SH25) Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
57,700,000.
57,700,000.
 
February Review New approval Bridge renewals Wellington Highway & Network Operations Mt Victoria Tunnel - Safety Improvements Design HMH Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
3,800,000.
3,800,000.
Subject to:

A) The CE's approval of a procurement procedure, assessed under s25 of the LTMA, covering the procurement of both projects through an alliance contract, which is to include a hold point when the target price is agreed to enable the Board to c
February Review New approval Bridge renewals Wellington Highway & Network Operations Terrace Tunnel - Safety Improvements Design HMH Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
3,000,000.
3,000,000.
Subject to:

A) The CE's approval of a procurement procedure, assessed under s25 of the LTMA, covering the procurement of both projects through an alliance contract, which is to include a hold point when the target price is agreed to enable the Board to c
February Review New approval Bus and ferry infrastructure Auckland Regional Transport Authority Ferry Terminal Upgrades - Other Remedial Works Design HHL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
100,000.
60,000.
 
February Review New approval Bus and ferry infrastructure Auckland Regional Transport Authority Route Scheduling Upgrade Project Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
1,990,000.
1,194,000.
 
February Review New approval Bus and ferry infrastructure Environment Canterbury Electronic ticketing upgrade Construction HHH Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
3,000,000.
1,800,000.
Subject to written confirmation of Environment Canterbury's (EC) agreement to:

i) Incorporate in its request for tender document requirements for system features that will allow future interoperability with a national system, details of which will be pro
February Review New approval Bus and ferry infrastructure Manukau City Council Manukau Interchange Investigation HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
350,000.
210,000.
 
February Review New approval Bus and ferry infrastructure Rodney District Council PT Infrastructure Upgrade- Opposite Silverdale Rugby Club Construction HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
46,700.
27,086.
 
February Review New approval Cycle facilities Hamilton City Council Cycling - Te Hikuwai Reserve Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
410,200.
225,610.
 
February Review New approval Cycle facilities Rodney District Council Orewa West Walkway/Cycleway Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
3,847,000.
2,231,260.
 
February Review New approval Cycle facilities Tasman District Council Richmond Railway Reserve Shared Use Path Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
364,400.
214,996.
 
February Review New approval Cycle facilities Tasman District Council Shared Use Path-School Rd to Community Rd Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
148,000.
87,320.
 
February Review New approval Cycle facilities Waikato Highway & Network Operations Massey Street Cycle Lane Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
600,000.
600,000.
 
February Review New approval Cycle facilities Waikato Highway & Network Operations Ohaupo Rd W&C (Lorne to Dixon) Investigation HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
40,000.
40,000.
 
February Review New approval Cycle facilities Whakatane District Council Warren Cole Path Cycle Facilities 08/09 Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
580,000.
319,000.
 
February Review New approval Emergency reinstatement West Coast Highway & Network Operations E/W West Coast Dec 08 Flood damage Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
350,000.
350,000.
 
February Review New approval New roads and structures Auckland Highway & Network Operations McKinney Road / Wech Drive Intersection improvements Design MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
450,000.
450,000.
 
February Review New approval New roads and structures Waikato Highway & Network Operations Te Rapa Bypass (SH01N) Design HHL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
5,000,000.
5,000,000.
 
February Review New approval New roads and structures Waitakere City Council New Lynn ToD Project - Stage 1 Construction HHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
9,840,000.
3,063,400.
 
February Review New approval New roads and structures Wellington Highway & Network Operations Melling I/C Investigation HHM Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
3,300,000.
3,300,000.
Subject to:

i) The NZTA's Highway and Network Operations Group providing an assessment of the adjacent Kennedy Good intersection as well as the intersections of local roads with SH2 between Melling and Kennedy Good;

ii) The CE requesting that Greater We
February Review New approval Pedestrian facilities Queenstown-Lakes District Council Walking & Cycling Project Scoping Investigation HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
100,000.
53,000.
 
February Review New approval Pedestrian facilities Rodney District Council PT Infrastructure Upgrade- Opposite Silverdale Rugby Club Construction HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
53,400.
30,972.
 
February Review New approval Pedestrian facilities Rodney District Council Walkway/Cycleway-Shelly Beach Road Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
221,000.
128,180.
 
February Review New approval Preventive works Auckland City Council Leighton St Retaining Wall Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
575,000.
247,250.
 
February Review New approval Preventive works Rodney District Council Slip Repair, Wainui Road RP 1208 Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
80,000.
38,400.
 
February Review New approval Preventive works Rodney District Council Slip Repair, Whangaparaoa Road, Hobbs Bay Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
175,000.
84,000.
 
February Review New approval Property purchase (local roads) Waitakere City Council New Lynn ToD Project - Stage 1 Construction HHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
3,330,000.
1,764,900.
 
February Review New approval Property purchase (state highways) BOP Highway & Network Operations Tauranga Eastern Motorway (TEM) Property MML Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
28,000,000.
28,000,000.
Subject to:



1) the $28m being considered as an advance of future years allocation



2) any purchase for the TEM being consistent with HNO’s  property purchase policy and usual practise



3) net property cost from C funds, the surplus land to be funde
February Review New approval Rail freight operations NZ Transport Agency NZTA Central Log Rail Implementation Funding Construction HHH Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
975,000.
975,000.
Subject to the NLTP Review Group's approval of:

1) the Funding Agreement between Pentarch and the NZTA; and

2) the procurement procedure for this activity.
February Review New approval Rail freight operations NZ Transport Agency Tangiwai to Centre Port Rail Freight Construction HHH Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
820,000.
820,000.
Subject to NLTP Review Group approval of:

1) the Funding Agreement between NZTA and Winstone Pulp Industries Ltd; and

2) the procurement procedure for this activity.
February Review New approval Road reconstruction Ashburton District Council Northpark Rd/SH1 Intersection upgrade Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
608,000.
81,510.
 
February Review New approval Road reconstruction Ashburton District Council Works Rd/SH 1 Intersection Upgrade Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
375,000.
55,860.
 
February Review New approval Road reconstruction Auckland City Council Frank Grey Place / Princes St Intersection Improvements Construction LMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
600,000.
318,000.
 
February Review New approval Road reconstruction Auckland Highway & Network Operations Newmarket Viaduct to Greenlane Aux Construction HMM Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
22,700,000.
22,700,000.
Subject to confirmation from the NZTA's Highway and Network Operations Group that it has recieved the alteration of designation.
February Review New approval Road reconstruction Hawkes Bay Highway & Network Operations Matahorua Gorge Realignment Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
31,300,000.
31,300,000.
 
February Review New approval Road reconstruction Papakura District Council Hingaia Rd Hinau Rd to Pararekau Rd improvements Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
2,375,054.
958,529.
 
February Review New approval Road reconstruction Porirua City Council Titahi Bay Rd/Te Hiko/Wineera Upgrade Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
760,000.
410,400.
 
February Review New approval Road reconstruction Selwyn District Council Waddington Intersection Ugrade Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
550,000.
232,000.
 
February Review New approval Road reconstruction Wairoa District Council Cricklewood Road (RDR) Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
400,000.
1,000,000.
 
February Review New approval Road reconstruction Wairoa District Council Rohepotae Road(RD) Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
80,000.
80,000.
 
February Review New approval Road reconstruction Waitakere City Council New Lynn ToD Project - Stage 1 Construction HHM Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
32,750,000.
13,462,000.
Subject to Waitakere City Council formal agreement to:

i) Contribute at least $7.35m toward the total cost of the package as developer contributions, thereby reducing the requirement for a NZTA subsidy; and

ii) Use its best endeavours to pursue and cont
February Review New approval Road reconstruction Wellington Highway & Network Operations RH : Muldoon's Corner Easing Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
16,500,000.
16,500,000.
 
February Review New approval Road studies Auckland City Council Dominion Road Deviation - Feasiblity Study Study HH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
95,500.
71,625.
 
February Review New approval Road studies Hamilton City Council Future Proof - Traffic Modelling Study HH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
30,000.
22,500.
 
February Review New approval Road studies South Waikato District Council District Land Transport Strategy 08/09 Study HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
50,000.
37,500.
 
February Review New approval Road studies Upper Hutt City Council Roading Network Study Study HM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
57,400.
43,050.
 
February Review New approval Road studies Whangarei District Council Whangarei Urban Area South Roading Strategy Study 2008/09 Study HH Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request
70,000.
52,500.
That the TOR for the study include a statement that Council will require the developers, who have lodged private plan changes, to complete an integrated transport assessment, and mitigate potential adverse effects of the development on the transporatation
February Review New approval Sea freight operations NZ Transport Agency Round One Domestic Sea Freight Development Fund: Imp Funding Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
2,010,000.
2,010,000.
 
February Review New approval Seal extension Auckland City Council Aotea Seal Extension Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
3,518,000.
1,864,540.
 
February Review New approval Seal extension Central Hawkes Bay District Council Atua Road - Seal Extension Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
700,000.
469,000.
 
February Review New approval Seal extension Tararua District Council Coast Rd Seal Extension 08-09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
220,000.
154,000.
 
February Review New approval Super gold card Environment Bay of Plenty Supergold Card Trip Payment Allocation Construction LLL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
267,000.
267,000.
 
February Review New approval Super gold card Environment Waikato Supergold Card Trip Payment Allocation Construction LLL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
458,000.
458,000.
 
February Review New approval Super gold card Northland Regional Council Supergold Card Trip Payment Allocation Construction LLL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
44,000.
44,000.
 
February Review New approval Super gold card Taranaki Regional Council Supergold Card Trip Payment Allocation Construction LLL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
51,000.
51,000.
 
February Review New approval Super gold card administration Environment Bay of Plenty Supergold Card Administration Allocation Construction LLL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
49,000.
49,000.
 
February Review New approval Super gold card administration Environment Waikato Supergold Card Administration Allocation Construction LLL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
70,000.
70,000.
 
February Review New approval Super gold card administration Northland Regional Council Supergold Card Administration Allocation Construction LLL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
11,000.
11,000.
 
February Review New approval Super gold card administration Taranaki Regional Council Supergold Card Administration Allocation Construction LLL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
12,000.
12,000.
 
February Review New approval Traffic management Rodney District Council Stock Effluent Disposal Station - Wellsford Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
226,000.
131,080.
 
February Review New approval System use studies Auckland City Council Designations Plan (Study - NEW TEMPLATE) Study   Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request
 
February Review New approval - emergency works Emergency reinstatement Hamilton City Council Waikato River Cycleway - Riverbank Slip Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
36,500.
16,425.
 
February Review New approval - emergency works Emergency reinstatement Kaipara District Council E/W 26th-30th July 2008 : Various sites Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
2,000,000.
1,200,000.
 
February Review New approval - emergency works Emergency reinstatement New Plymouth District Council 2007-08 Emergency Works Programme Carrington Rd Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
185,000.
96,200.
 
February Review New approval - emergency works Emergency reinstatement New Plymouth District Council Egmont Rd SPR Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
135,000.
135,000.
 
February Review New approval - emergency works Emergency reinstatement Thames-Coromandel District Council E/W Minor Events 2008/2009 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
286,000.
122,980.
 
February Review New approval - emergency works Emergency reinstatement Waikato District Council E/W Minor Events 2008/10 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
925,000.
499,500.
 
February Review New approval - emergency works Emergency reinstatement Waitomo District Council E/W Minor Events 2008/2009 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request
390,000.
280,800.