Decisions from the NLTP Review Group, March 2009

Download this table as a spreadsheet (Excel, 31 KB)

Review Name Request Type Work category Org Name Project Name Phase Type Profile Decision Reason Total cost change NLTA share change Condition
March Review New approval Bridge renewals Chatham Islands Council Gillespies Culvert (T funds) Construction MMH Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request   139,402.  
March Review New approval Bridge renewals South Taranaki District Council Bridge 143 Replacement - Parihaka Road Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 340,000. 204,000.  
March Review New approval Cycle facilities BOP Highway & Network Operations Poike Road Pedestrian & Cycle Facility Investigation HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 30,000. 30,000.  
March Review New approval Cycle facilities Christchurch City Council Railway Cycleway  North (Northcote Rd to Tuckers Rd) Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 709,050. 375,797.  
March Review New approval Cycle facilities Tasman District Council Rototai Road Shared Use Path Stage 2 Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 79,500. 46,905.  
March Review New approval Cycle facilities Waitakere City Council Cycleway - Te Atatu Peninsula Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 665,000. 352,450.  
March Review New approval New roads and structures Hawkes Bay Highway & Network Operations HB Expressway Southern Extension Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 12,000,000. 12,000,000.  
March Review New approval Passenger rail infrastructure Greater Wellington Rail Infra - Project Management for Wgtn Area Rail Projects Construction MMM Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request 2,228,000. 2,005,200. Subject to apportionment of these costs to particular tasks as stated on page 12 of the Output Agreement for Wellington Metro Rail Upgrade, between the Minister of Finance and ONTRACK.
March Review New approval Passenger transport road improvements North Shore City Council Carlisle Road BPM (East Coast Rd to Browns Bay) Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 860,000. 455,800.  
March Review New approval Pedestrian facilities Auckland City Council Cycling & Walking Implementation (2008/09) Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 846,000. 448,380.  
March Review New approval Pedestrian facilities Auckland City Council Cycling & Walking Implementation (2008/09) - Kepa Rd Construction HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 230,000. 121,900.  
March Review New approval Regional transport studies Westland District Council West Coast Regional Walking and Cycling Strategy Study HH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 10,000. 7,500.  
March Review New approval Road reconstruction Gisborne District Council Lower Tauwhareparae Road (RD) Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 900,000. 900,000.  
March Review New approval Road reconstruction Kapiti Coast District Council Pavement Smoothing Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 215,000. 113,950.  
March Review New approval Road reconstruction Palmerston North City Council Railway Road Improvement. Construction MMH Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request 2,782,000. 1,557,920. Funding approval is conditional upon: 1. the intersection with Airport Drive being a roundabout; 2. Council demonstrating commitment to the total project by including the funding for Stage 2 in its LTCCP for 2009/10.
March Review New approval Road reconstruction Ruapehu District Council Dobbs Bluff Reconstruction Construction L Approved in part The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined  because the requirements of section 20 of the LTMA have not been met or deferred for late 601,000. 720,720.  
March Review New approval Road reconstruction Ruapehu District Council Dobbs Bluff Reconstruction Design L Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request   72,000.  
March Review New approval Road studies Auckland City Council Railway Level Crossings - Feasibility Study Study   Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request      
March Review New approval Road studies Hastings District Council Urban Transportation Strategy Study HM Approved with conditions Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request 180,000. 244,800. Subject to consideration of adjoining linkages/integration with Napier urban area.
March Review New approval Road studies Papakura District Council Takanini Grade separation Study   Declined The requirements of section 20 of the Land Transport Management Act 2003 have not been met.  Further details regarding the reasons can be accessed on LTP online or by request      
March Review New approval Road studies Queenstown-Lakes District Council Walking & Cycling Audits Study HH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 90,000. 67,500.  
March Review New approval System use studies Hamilton City Council Access Hamilton Study Review Study HM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 406,000. 304,500.  
March Review New approval System use studies North Shore City Council NSCC Freight Study 08-09 Study HH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 100,000. 75,000.  
March Review New approval - emergency works Emergency reinstatement Hauraki District Council Effect of Drought in Jan - April 2008 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 4,141,000. 3,492,670.  
March Review New approval - emergency works Emergency reinstatement Waitaki District Council E/W - Flooding in Waitaki District February 2009 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 117,000. 73,710.  
March Review Cost / Scope adjustment Drainage renewals Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 493,000. 251,430.  
March Review Cost / Scope adjustment Emergency reinstatement Auckland Highway & Network Operations (E) Waiwhiu Rd Slip Auckland April 07 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 2,800. 2,800.  
March Review Cost / Scope adjustment Emergency reinstatement Franklin District Council Emergency Works 2008/2009 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 303,958. 155,019.  
March Review Cost / Scope adjustment Emergency reinstatement Gisborne District Council Emergency Works 08/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 300,000. 224,000.  
March Review Cost / Scope adjustment Emergency reinstatement Gisborne Highway & Network Operations E/Works 08/09 Kemps Hill Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 371,000. 371,000.  
March Review Cost / Scope adjustment Emergency reinstatement Hawkes Bay Highway & Network Operations Emergency Works 07/08 -HB 07/08 Storm. Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -200. -200.  
March Review Cost / Scope adjustment Emergency reinstatement Hurunui District Council Flood Damage District Wide - July& August 2008 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 3,375,180. 3,168,535.  
March Review Cost / Scope adjustment Emergency reinstatement Hurunui District Council Flood Damage SPR Road - July 2008 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 951,597. 951,597.  
March Review Cost / Scope adjustment Emergency reinstatement Manawatu/Wanganui Highway & Network Operations E/W East Wanganui July & August 2008 Storm Events Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 112,500. 112,500.  
March Review Cost / Scope adjustment Emergency reinstatement Stratford District Council E/W Minor Events 07/08 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 0. 2,400.  
March Review Cost / Scope adjustment Emergency reinstatement Stratford District Council E/W Minor Events 08/09 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 123,000. 68,960.  
March Review Cost / Scope adjustment Emergency reinstatement Waikato Highway & Network Operations E/W [E] 08/011/3 Raglan Road SH23 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 110,000. 110,000.  
March Review Cost / Scope adjustment Emergency reinstatement Waikato Highway & Network Operations E/W [E]08/013/3 Tongaporutu Underslip Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 650,000. 650,000.  
March Review Cost / Scope adjustment Emergency reinstatement Waikato Highway & Network Operations E/W CW SH46 Blocked Culvert 15th April 2008 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -200. -200.  
March Review Cost / Scope adjustment Emergency reinstatement Waitomo District Council E/W Minor Events 2008/2009 Construction   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 25,450. 98,542.  
March Review Cost / Scope adjustment Environmental maintenance Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -35,500. -18,105.  
March Review Cost / Scope adjustment Network and asset management Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -40,400. -20,604.  
March Review Cost / Scope adjustment Network and asset management Queenstown-Lakes District Council Maintenance Programme 2008/09 Crown Range   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 79,000. 71,100.  
March Review Cost / Scope adjustment Network and asset management Queenstown-Lakes District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 861,000. 370,230.  
March Review Cost / Scope adjustment Network and asset management Queenstown-Lakes District Council Maintenance Programme 2008/09 SPR   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 92,000. 92,000.  
March Review Cost / Scope adjustment New roads and structures BOP Highway & Network Operations Harbour Link Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -22,785,200. -22,785,200.  
March Review Cost / Scope adjustment New roads and structures Tasman Highway & Network Operations Ruby Bay Bypass A Construction LML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -2,000,000. -1,981,926.  
March Review Cost / Scope adjustment Pavement rehabilitation Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -252,000. -128,520.  
March Review Cost / Scope adjustment Pavement rehabilitation North Shore City Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,071,000. 460,530.  
March Review Cost / Scope adjustment Pavement rehabilitation Waitaki District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -203,300. -115,881.  
March Review Cost / Scope adjustment Preventive works Otago Highway & Network Operations Nevis Bluff P5 Rock Removal Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -382,000. -382,000.  
March Review Cost / Scope adjustment Road reconstruction Auckland City Council Pavement Reconstruction 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 186,000. 98,580.  
March Review Cost / Scope adjustment Road reconstruction North Shore City Council Pavement Reconstruction 2008/09 Construction MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 423,815. 224,622.  
March Review Cost / Scope adjustment Road reconstruction Rodney District Council Warkworth SH1 Intersection Improvements (Design) Design MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 82,500. 47,850.  
March Review Cost / Scope adjustment Road reconstruction Waimakariri District Council Flaxton Road / Fernside Road Intersection Improvements. Design LMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 12,000. 7,080.  
March Review Cost / Scope adjustment Routine drainage maintenance Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -53,800. -27,438.  
March Review Cost / Scope adjustment Seal extension DOC (Mt Cook) Tasman Valley Road sealing Design MMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 140,000. 140,000.  
March Review Cost / Scope adjustment Sealed pavement maintenance Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 208,200. 106,182.  
March Review Cost / Scope adjustment Sealed road resurfacing Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -658,000. -335,580.  
March Review Cost / Scope adjustment Sealed road resurfacing Franklin District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 468,000. 238,680.  
March Review Cost / Scope adjustment Structures component replacements Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 37,960. 19,359.6  
March Review Cost / Scope adjustment Structures maintenance Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -57,250. -29,197.5  
March Review Cost / Scope adjustment Traffic services maintenance Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 91,900. 46,869.  
March Review Cost / Scope adjustment Traffic services renewals Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request -85,707. -43,710.57  
March Review Cost / Scope adjustment Unsealed pavement maintenance Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 43,300. 22,083.  
March Review Cost / Scope adjustment Unsealed road metalling Central Otago District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 658,809. 335,992.59  
March Review Cost / Scope adjustment Unsealed road metalling Waitaki District Council Maintenance Programme 2008/09 Local Roads   Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 80,000. 45,600.