| Review Name | Request Type | Work category | Org Name | Project Name | Phase Type | Profile | Decision | Reason | Total cost change | NLTA share change | Condition |
|---|---|---|---|---|---|---|---|---|---|---|---|
| June Review | New approval | Bridge renewals | Wellington City Council | Advance Fees | Design | LM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Bus and ferry infrastructure | Tauranga City Council | Tauranga Transport Centre construction | Investigation | HML | Approved in part | The requirements of section 20 of the Land Transport Management Act 2003 (LTMA) have been met for part of the request. The balance of the request is either declined because the requirements of section 20 of the LTMA have not been met or deferred for late | 49,000. | 29,400. | |
| June Review | New approval | Cycle facilities | Auckland Highway & Network Operations | SH16 Central Auckland Connection (CMJ) | Investigation | HMM | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 200,000. | 200,000. | Subject to the inclusion of the activity in the final Auckland RLTP. |
| June Review | New approval | Cycle facilities | BOP Highway & Network Operations | Mourea Bridge Pedestrian Cycleway | Investigation | HMM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Cycle facilities | Manukau City Council | Cycle Routes 2008/09 (Chapel Road: Aspiring to Ormiston) | Construction | HM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Cycle facilities | Manukau City Council | Cycle Routes 2008/09 (GSR: Manukau Super Clinic - Hill Rd) | Construction | HM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Cycle facilities | Manukau City Council | Cycle Routes 2008/09 (Lambie Drive North) | Construction | HM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Cycle facilities | Wellington Highway & Network Operations | Paraparaumu Rail Overbridge Clip-on Cycle Lane | Design | HML | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Passenger rail infrastructure | Auckland Regional Council | Newmarket Rail Station Construction Completion | Construction | HHL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 5,000,000. | 5,000,000. | |
| June Review | New approval | Passenger transport infrastructure | Auckland Regional Transport Authority | Avondale Rail Station | Construction | M | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Passenger transport infrastructure | Auckland Regional Transport Authority | Grafton Rail Station | Construction | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | ||||
| June Review | New approval | Passenger transport infrastructure | Auckland Regional Transport Authority | Kingsland Station Enhancements for RWC | Construction | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | ||||
| June Review | New approval | Passenger transport infrastructure | Auckland Regional Transport Authority | New Lynn Rail Station | Construction | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | ||||
| June Review | New approval | Passenger transport infrastructure | Auckland Regional Transport Authority | Onehunga Branch stations (DART 19) | Construction | HM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Passenger transport infrastructure | Auckland Regional Transport Authority | Onehunga Branch stations (DART 19) | Design | HM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Passenger transport infrastructure | Manukau City Council | Papatoetoe Park & Ride Extension Phase 2 | Construction | HM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Pedestrian facilities | North Shore City Council | 2009/10 Albany Highway Corridor (Oteha Footbridge) | Construction | HMH | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 2,245,583. | 595,079. | Approval subject to consent approvals & confirmation of agreement with MOE. |
| June Review | New approval | Pedestrian facilities | Thames-Coromandel District Council | TCDC Walking and Cycling Infrastructure (Phase 2 cont) | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 245,000. | 129,850. | |
| June Review | New approval | Preventive maintenance | Waitakere City Council | Kay Road Slip Repairs | Construction | MM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Preventive works | DOC (Hokitika) | Preventive Maintenance (09/10) Fox Glacier North Terminal | Construction | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | ||||
| June Review | New approval | Preventive works | Waitakere City Council | Titirangi Beach Rd Slip Repairs | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 67,000. | 28,810. | |
| June Review | New approval | Preventive works | Waitakere City Council | Titirangi Rd Slip Repairs | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 81,000. | 34,830. | |
| June Review | New approval | Regional transport studies | Northland Regional Council | Regional Procurement Strategy | Study | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | ||||
| June Review | New approval | Road reconstruction | Gisborne Highway & Network Operations | SH 35 Tolaga to Gisborne Seal Widening | Construction | MMM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | |||
| June Review | New approval | Road reconstruction | Queenstown-Lakes District Council | Royal Burn Glencoe rehab and realignment Crown Range SPR | Construction | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,403,400. | 1,052,550. | |
| June Review | New approval | Road reconstruction | Wellington Highway & Network Operations | SH2 Moonshine Hill Rd - Silverstream Safety Improvements | Design | HMM | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 348,000. | 348,000. | That the GM RP&P: a. Approves funding for the design of NZTA's SH2 River Road Safety Improvements from Moonshine Hill Road to Silverstream project at an estimated cost of $348000 from N funds, b. Approves funding for the legislation of SH2 River Roa |
| June Review | New approval | System use studies | Kapiti Coast District Council | Cycle Strategy (Review) | Study | HM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 33,000. | 32,250. | |
| June Review | New approval | System use studies | Tasman District Council | Cycling and Walking Strategy 2008/09 | Study | HM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 26,200. | 19,650. | |
| June Review | New approval - emergency works | Emergency reinstatement | Canterbury Highway & Network Operations | EW South Canterbury 14-19 May 09 Flood Damage | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 163,400. | 163,400. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Central Otago District Council | May 2009 Flood Damage | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 31,574. | 16,103. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Christchurch City Council | EW - Whitewash Head Rd - 20/05/09 - Initial & Perm Reinstate | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 215,000. | 92,450. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Far North District Council | E/W event 12 to 14 June 2009 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 367,500. | 245,625. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Mackenzie District Council | Flood Damage May 2009 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 190,000. | 113,100. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Masterton District Council | E/works 08/09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 300,000. | 165,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Northland Highway & Network Operations | EW Severe Rainstorm Event Northland May 2009 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,370,000. | 1,370,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Opotiki District Council | Amokura Road Washout Flood Damage | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 95,000. | 49,400. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Otago Highway & Network Operations | EW Central Otago Heavy Rain Event 16/17 May 2009 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 75,000. | 75,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Otago Highway & Network Operations | EW Omarama Flood Event 17 May 2009 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 160,000. | 160,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Queenstown-Lakes District Council | Emergency Works 16/17 May 2009 Glenorchy SPR | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 40,000. | 40,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Queenstown-Lakes District Council | Emergency Works 16/17 May 2009 Local Roads | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 258,500. | 128,005. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Rodney District Council | Emergency Slip Repair, Shepherd Road RP 1600, Wellsford | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 282,273. | 135,491. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Waikato Highway & Network Operations | EW CW Snow & Ice Clearing SH1 May & June 09 09/005/3 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 190,000. | 190,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Waikato Highway & Network Operations | EW Mercer South Slip 09/006/3 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 120,000. | 120,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Waikato Highway & Network Operations | EW SH 3 Okau Slip 09/004/3 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 390,000. | 390,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Waikato Highway & Network Operations | EW SH25 Tararu Tree Removal 09/007/3 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 150,000. | 150,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Waikato Highway & Network Operations | EW SH25 Whangamaroro River Wash Out 09/008/3 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 125,000. | 125,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Wairoa District Council | Emergency Works. 2008/09 - May Event | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 740,000. | 534,400. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Waitaki District Council | E/W - flooding in the Waitaki District May 2009 -Stage 1 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 72,450. | 47,093. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Waitaki District Council | E/W - fooding in the Waitaki District May 2009 - Stage 2 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 20,000. | 11,400. | ||
| June Review | New approval - emergency works | Emergency reinstatement | West Coast Highway & Network Operations | EW West Coast May 09 Flooding Scour | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,470,000. | 1,470,000. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Westland District Council | Westland District Flood Damage - Local Roads | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 62,451. | 36,846. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Westland District Council | Westland District Special Purpose Road Flood Damage | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 161,645. | 161,645. | ||
| June Review | New approval - emergency works | Emergency reinstatement | Whakatane District Council | WDC Emergency Works Feb/Mar 2009 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 289,000. | 134,910. | ||
| June Review | Cost / Scope adjustment | Bridge renewals | West Coast Highway & Network Operations | Arahura BR | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -46,200. | -46,200. | |
| June Review | Cost / Scope adjustment | Community coordination | Christchurch City Council | Community coordination 431 | Implementation | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -40,000. | -30,000. | |
| June Review | Cost / Scope adjustment | Community coordination | Nelson City Council | Road Safety and Travel planning co-ordination | Implementation | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -120,000. | -90,000. | |
| June Review | Cost / Scope adjustment | Community programmes | Christchurch City Council | Community Programmes 432 | Implementation | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -240,529. | -154,629. | |
| June Review | Cost / Scope adjustment | Emergency reinstatement | DOC (Hokitika) | Franz Josef Road Emergency Works - April 09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 16,500. | 16,500. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Far North District Council | E/W 26th-28th July 2008 : Various sites | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 400,000. | 340,000. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Far North District Council | E/W July 10 2007 : Various sites | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -835,000. | -709,750. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Gisborne District Council | Emergency Works 07/08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -100,000. | -49,000. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Kaikoura District Council | Emergency Works 30 July 2008 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 39,490. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Manawatu/Wanganui Highway & Network Operations | EW SH4 Raukawa Falls West Wanganui | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 155,000. | 155,000. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Queenstown-Lakes District Council | EW 08/09 August 2008 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | -15,620. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Ruapehu District Council | E/Works 08/09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 500,000. | 455,000. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | South Taranaki District Council | E/W July & Aug 06 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 2,000. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Western BoP District Council | Emergency Works 2008 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 207,597. | 93,419. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Whakatane District Council | EW July 2008 Storm Events Local Roads | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 11,340. | ||
| June Review | Cost / Scope adjustment | Emergency reinstatement | Whakatane District Council | Matata May 2005 Event - Completion of Reinstatement | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 11,970. | ||
| June Review | Cost / Scope adjustment | Minor improvements | Gisborne District Council | Minor improvements 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 90,560. | 62,486. | Equivalent reduction to be made to 09/10 allocation. | |
| June Review | Cost / Scope adjustment | New roads and structures | Waikato Highway & Network Operations | Avalon Drive Bypass | Construction | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 70,000. | 70,000. | |
| June Review | Cost / Scope adjustment | New roads and structures | Waikato Highway & Network Operations | Te Rapa Bypass (SH01N) | Investigation | HHL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 100,000. | 100,000. | |
| June Review | Cost / Scope adjustment | Preventive works | Gisborne District Council | Preventive Maintenance East Cape Road Rock Protection | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -51,029. | -30,107. | |
| June Review | Cost / Scope adjustment | Property purchase (state highways) | Auckland Highway & Network Operations | Waterview Connection | Property | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 0. | |
| June Review | Cost / Scope adjustment | Road reconstruction | Gisborne District Council | Bridge Capacity Assessment (RD) | Investigation | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -17,654. | -17,654. | |
| June Review | Cost / Scope adjustment | Road reconstruction | Gisborne District Council | Duncan Road Upgrading [RD] | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -6,489. | -6,489. | |
| June Review | Cost / Scope adjustment | Road reconstruction | Gisborne District Council | Glenroy Road Upgrading (RD) | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -65,576. | -65,576. | |
| June Review | Cost / Scope adjustment | Road reconstruction | Gisborne District Council | Matairau Road (RD) | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -125,199. | -125,199. | |
| June Review | Cost / Scope adjustment | Road reconstruction | Hawkes Bay Highway & Network Operations | Meeanee Road Interchange | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 55,000. | 55,000. | |
| June Review | Cost / Scope adjustment | Road reconstruction | Queenstown-Lakes District Council | Royal Burn Glencoe rehab and realignment | Construction | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -1,403,400. | -743,802. | |
| June Review | Cost / Scope adjustment | Sealed pavement maintenance | Gisborne District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 205,000. | 120,950. | ||
| June Review | Cost / Scope adjustment | Super gold card administration | Gisborne District Council | Supergold Card Administration Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | -2,000. | |
| June Review | Cost / Scope adjustment | System use studies | Manukau City Council | Mill Rd/Redoubt Rd Corridor Study (MPP) | Study | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 111,000. | 58,830. | |
| June Review | Cost / Scope adjustment | Traffic management | National Office Highway & Network Operations | Toll Systems Project - Stage 1 | Design | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -980,000. | -980,000. | |
| June Review | Cost / Scope adjustment | Traffic services maintenance | Gisborne District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 50,000. | 29,500. |