Decisions from the NLTP Review Group, SH5 adjustments from 2007/08

Download this table as a spreadsheet (Excel, 49 KB)

Review name Request type Work category Organisation name Project name Phase type Profile Decision Reason
Total cost change
NLTA share change
Condition
SH5 Adjustments from 2007/08 Cost / Scope adjustment Bridge renewals Auckland Highway & Network Operations AHB Structural Upgrade Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 37,100. 37,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Bridge renewals Auckland Highway & Network Operations Newmarket Viaduct Construction HHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 264,600. 264,600.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Bridge renewals Auckland Highway & Network Operations Punganui Stream Bridge Replacement Design MHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 15,700. 15,700.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Bridge renewals Auckland Highway & Network Operations Vic Park Tunnel Design HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 188,100. 188,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Bridge renewals Marlborough Highway & Network Operations Awatere Bridge Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 77,100. 77,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Bridge renewals Otago Highway & Network Operations Kawarau Falls Bridge Investigation LLL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 19,200. 19,200.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Bridge renewals West Coast Highway & Network Operations Arahura BR Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 218,200. 218,200.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Central Motorway Junction, Stage 2 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 68,000. 68,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Hobsonville Deviation Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 916,400. 916,400.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Manukau Extension Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 2,810,900. 2,810,900.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Manukau Hbour. Xing Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,739,400. 1,739,400.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Mt Roskill Extension Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 3,993,900. 3,993,900.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations SH20 Manukau Harbour Crossing Design HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 85,000. 85,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Waterview Connection Investigation HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 253,100. 253,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Auckland Highway & Network Operations Western Ring Route Toll Development Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 57,600. 57,600.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures BOP Highway & Network Operations Harbour Link Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 3,450,300. 3,450,300.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures BOP Highway & Network Operations Omokoroa Road intersection improvements Investigation HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 5,600. 5,600.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures BOP Highway & Network Operations Pyes Pa Bypass Design MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 28,400. 28,400.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Canterbury Highway & Network Operations Christchurch Southern Motorway Extension (Master) Design LML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 118,600. 118,600.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Hawkes Bay Highway & Network Operations HB Expressway Southern Extension Investigation LHL Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 19,100. 19,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Northland Highway & Network Operations Kamo Bypass Stage 2 Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 7,900. 7,900.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Otago Highway & Network Operations Caversham Corridor Improvements Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 13,400. 13,400.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Tasman Highway & Network Operations Ruby Bay Bypass A Design LML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 23,000. 23,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Waikato Highway & Network Operations Cambridge Bypass (2L) Design HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 49,000. 49,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Waikato Highway & Network Operations Te Rapa Bypass Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 94,500. 94,500.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Wellington Highway & Network Operations Kapiti Western Link Road (MPP) Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 17,900. 17,900.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures Wellington Highway & Network Operations Transmission Gully Investigation Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 484,800. 484,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment New roads and structures West Coast Highway & Network Operations Gates of Haast Realign Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 9,600. 9,600.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Passenger transport road improvements Auckland Highway & Network Operations North Shore Busway (MPP) Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,504,900. 1,504,900.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Auckland Highway & Network Operations AHB Storm Water Upgrade Construction HMH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 251,200. 251,200.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Auckland Highway & Network Operations Northcote - Sunnynook Aux. Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 505,400. 505,400.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Auckland Highway & Network Operations Papakura I/C Upgrade Investigation HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 32,800. 32,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Auckland Highway & Network Operations Te Atatu - Royal 6L Investigation HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 101,000. 101,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction BOP Highway & Network Operations Katikati Bypass Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 4,200. 4,200.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction BOP Highway & Network Operations Pyes Pa Bypass Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 164,900. 164,900.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction BOP Highway & Network Operations Tauranga Central Corridor Improvements Stage 2 Investigation HHH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 2,100. 2,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction BOP Highway & Network Operations Tauranga Eastern Motorway (TEM) Design MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 162,100. 162,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction BOP Highway & Network Operations Tauranga Eastern Motorway (TEM) Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 22,100. 22,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Hawkes Bay Highway & Network Operations Matahorua Gorge Realignment Design MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 15,100. 15,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Hawkes Bay Highway & Network Operations Meeanee Road Interchange Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 141,000. 141,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Hawkes Bay Highway & Network Operations Prebensen Drive / Hyderabad Road Interchange Investigation LML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,500. 1,500.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Hawkes Bay Highway & Network Operations Waipukurau Overbridge Realignment Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 49,700. 49,700.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Hawkes Bay Highway & Network Operations Waipukurau Overbridge Realignment Design HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 16,000. 16,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Manawatu/Wanganui Highway & Network Operations Hihitahi Bluffs Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 12,800. 12,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Manawatu/Wanganui Highway & Network Operations Ohingaiti-Makohine Realignment Construction MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 144,300. 144,300.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Manawatu/Wanganui Highway & Network Operations SH2 Papatawa Realignment Design MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 2,700. 2,700.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Nelson Highway & Network Operations SH6 Whangamoa South Realignment Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 10,100. 10,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Northland Highway & Network Operations Akerama Curves Realign & PL Design MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 21,200. 21,200.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Northland Highway & Network Operations Bulls Gorge Realign Design HHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 17,300. 17,300.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Northland Highway & Network Operations Katetoke/Oakleigh Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 400. 400.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Otago Highway & Network Operations Tumai to Waikouaiti  Realignment Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 54,200. 54,200.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Taranaki Highway & Network Operations Bell Block Bypass (including Mangaone 4 Laning) Construction MHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 320,500. 320,500.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Taranaki Highway & Network Operations Normanby Overbridge Realignment Design MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 3,700. 3,700.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Taranaki Highway & Network Operations Rugby Road Underpass Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 31,800. 31,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Waikato Highway & Network Operations Long Swamp to Rangiriri SI Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 7,700. 7,700.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Waikato Highway & Network Operations Mangatawhiri Township Deviat'n Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,321,000. 1,321,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Waikato Highway & Network Operations Maramarua Deviation Investigation HML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 6,900. 6,900.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Waikato Highway & Network Operations Mercer to Long Swamp Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 33,300. 33,300.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Waikato Highway & Network Operations Piarere - Oak Tree Bend Realign Design MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,800. 1,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Waikato Highway & Network Operations Rangiriri Four Laning Design HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 10,500. 10,500.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Wellington Highway & Network Operations Dowse to Petone I/C Construction HMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,855,600. 1,855,600.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Wellington Highway & Network Operations Kaitoke Existing Alignment Upgrade Realign Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 2,400. 2,400.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Wellington Highway & Network Operations Mackays Crossing Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 21,000. 21,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Wellington Highway & Network Operations Rimutaka Corner Easing (Muldoon's) Design MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 33,000. 33,000.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Wellington Highway & Network Operations SH2/58 Grade Separation Investigation MML Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 18,200. 18,200.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Road reconstruction Wellington Highway & Network Operations Wellington Inner City Bypass Stg 2. Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 88,800. 88,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Seal extension Northland Highway & Network Operations Waitiki Landing to Cape Reinga SE Stg 2 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 307,800. 307,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment System use studies Waikato Highway & Network Operations Ohinewai - Cambridge Strategy Investigation MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,700. 1,700.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management Auckland Highway & Network Operations AHB Moveable Lane Barrier Replacement Construction HHH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 54,800. 54,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management Auckland Highway & Network Operations ATMS Stage IV Construction HHH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 336,600. 336,600.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management Auckland Highway & Network Operations ATMS Stage IV Design HHH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 61,100. 61,100.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management Auckland Highway & Network Operations Northern Motorway TDM (Ramp Signalling) Construction HHH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 279,700. 279,700.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management Auckland Highway & Network Operations Northwestern Motorway TDM (Ramp Signalling) Construction HHH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 469,800. 469,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management Auckland Highway & Network Operations Southern Motorway TDM Construction HHH Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 658,600. 658,600.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management Auckland Highway & Network Operations WRR Ramp Signalling Construction HHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 87,800. 87,800.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management Auckland Highway & Network Operations WRR Ramp Signalling Design HHM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 20,600. 20,600.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management National Office Highway & Network Operations Toll Systems Project Design MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 22,300. 22,300.  
SH5 Adjustments from 2007/08 Cost / Scope adjustment Traffic management National Office Highway & Network Operations Toll Systems Project - Stage 1 Construction MMM Approved The requirements of section 20 of the Land Transport Management Act 2003 have been met.  Further details regarding the reasons can be accessed on LTP online or by request 1,000,200. 1,000,200.