| Review name | Request type | Work category | Organisation name | Project name | Phase type | Profile | Decision | Reason | Total cost change |
NLTA share change |
Condition |
|---|---|---|---|---|---|---|---|---|---|---|---|
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Bridge renewals | Auckland Highway & Network Operations | AHB Structural Upgrade | Construction | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 37,100. | 37,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Bridge renewals | Auckland Highway & Network Operations | Newmarket Viaduct | Construction | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 264,600. | 264,600. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Bridge renewals | Auckland Highway & Network Operations | Punganui Stream Bridge Replacement | Design | MHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 15,700. | 15,700. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Bridge renewals | Auckland Highway & Network Operations | Vic Park Tunnel | Design | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 188,100. | 188,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Bridge renewals | Marlborough Highway & Network Operations | Awatere Bridge | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 77,100. | 77,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Bridge renewals | Otago Highway & Network Operations | Kawarau Falls Bridge | Investigation | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 19,200. | 19,200. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Bridge renewals | West Coast Highway & Network Operations | Arahura BR | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 218,200. | 218,200. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | Central Motorway Junction, Stage 2 | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 68,000. | 68,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | Hobsonville Deviation | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 916,400. | 916,400. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | Manukau Extension | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 2,810,900. | 2,810,900. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | Manukau Hbour. Xing | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,739,400. | 1,739,400. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | Mt Roskill Extension | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,993,900. | 3,993,900. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | SH20 Manukau Harbour Crossing | Design | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 85,000. | 85,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | Waterview Connection | Investigation | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 253,100. | 253,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Auckland Highway & Network Operations | Western Ring Route Toll Development | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 57,600. | 57,600. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | BOP Highway & Network Operations | Harbour Link | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,450,300. | 3,450,300. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | BOP Highway & Network Operations | Omokoroa Road intersection improvements | Investigation | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 5,600. | 5,600. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | BOP Highway & Network Operations | Pyes Pa Bypass | Design | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 28,400. | 28,400. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Canterbury Highway & Network Operations | Christchurch Southern Motorway Extension (Master) | Design | LML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 118,600. | 118,600. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Hawkes Bay Highway & Network Operations | HB Expressway Southern Extension | Investigation | LHL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 19,100. | 19,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Northland Highway & Network Operations | Kamo Bypass Stage 2 | Investigation | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 7,900. | 7,900. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Otago Highway & Network Operations | Caversham Corridor Improvements | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 13,400. | 13,400. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Tasman Highway & Network Operations | Ruby Bay Bypass A | Design | LML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 23,000. | 23,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Waikato Highway & Network Operations | Cambridge Bypass (2L) | Design | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 49,000. | 49,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Waikato Highway & Network Operations | Te Rapa Bypass | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 94,500. | 94,500. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Wellington Highway & Network Operations | Kapiti Western Link Road (MPP) | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 17,900. | 17,900. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | Wellington Highway & Network Operations | Transmission Gully Investigation | Investigation | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 484,800. | 484,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | New roads and structures | West Coast Highway & Network Operations | Gates of Haast Realign | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 9,600. | 9,600. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Passenger transport road improvements | Auckland Highway & Network Operations | North Shore Busway (MPP) | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,504,900. | 1,504,900. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Auckland Highway & Network Operations | AHB Storm Water Upgrade | Construction | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 251,200. | 251,200. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Auckland Highway & Network Operations | Northcote - Sunnynook Aux. | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 505,400. | 505,400. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Auckland Highway & Network Operations | Papakura I/C Upgrade | Investigation | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 32,800. | 32,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Auckland Highway & Network Operations | Te Atatu - Royal 6L | Investigation | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 101,000. | 101,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | BOP Highway & Network Operations | Katikati Bypass | Investigation | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 4,200. | 4,200. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | BOP Highway & Network Operations | Pyes Pa Bypass | Construction | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 164,900. | 164,900. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | BOP Highway & Network Operations | Tauranga Central Corridor Improvements Stage 2 | Investigation | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 2,100. | 2,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | BOP Highway & Network Operations | Tauranga Eastern Motorway (TEM) | Design | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 162,100. | 162,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | BOP Highway & Network Operations | Tauranga Eastern Motorway (TEM) | Investigation | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 22,100. | 22,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Hawkes Bay Highway & Network Operations | Matahorua Gorge Realignment | Design | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 15,100. | 15,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Hawkes Bay Highway & Network Operations | Meeanee Road Interchange | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 141,000. | 141,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Hawkes Bay Highway & Network Operations | Prebensen Drive / Hyderabad Road Interchange | Investigation | LML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,500. | 1,500. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Hawkes Bay Highway & Network Operations | Waipukurau Overbridge Realignment | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 49,700. | 49,700. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Hawkes Bay Highway & Network Operations | Waipukurau Overbridge Realignment | Design | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 16,000. | 16,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Manawatu/Wanganui Highway & Network Operations | Hihitahi Bluffs | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 12,800. | 12,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Manawatu/Wanganui Highway & Network Operations | Ohingaiti-Makohine Realignment | Construction | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 144,300. | 144,300. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Manawatu/Wanganui Highway & Network Operations | SH2 Papatawa Realignment | Design | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 2,700. | 2,700. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Nelson Highway & Network Operations | SH6 Whangamoa South Realignment | Investigation | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 10,100. | 10,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Northland Highway & Network Operations | Akerama Curves Realign & PL | Design | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 21,200. | 21,200. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Northland Highway & Network Operations | Bulls Gorge Realign | Design | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 17,300. | 17,300. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Northland Highway & Network Operations | Katetoke/Oakleigh | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 400. | 400. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Otago Highway & Network Operations | Tumai to Waikouaiti Realignment | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 54,200. | 54,200. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Taranaki Highway & Network Operations | Bell Block Bypass (including Mangaone 4 Laning) | Construction | MHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 320,500. | 320,500. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Taranaki Highway & Network Operations | Normanby Overbridge Realignment | Design | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,700. | 3,700. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Taranaki Highway & Network Operations | Rugby Road Underpass | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 31,800. | 31,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Waikato Highway & Network Operations | Long Swamp to Rangiriri SI | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 7,700. | 7,700. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Waikato Highway & Network Operations | Mangatawhiri Township Deviat'n | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,321,000. | 1,321,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Waikato Highway & Network Operations | Maramarua Deviation | Investigation | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 6,900. | 6,900. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Waikato Highway & Network Operations | Mercer to Long Swamp | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 33,300. | 33,300. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Waikato Highway & Network Operations | Piarere - Oak Tree Bend Realign | Design | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,800. | 1,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Waikato Highway & Network Operations | Rangiriri Four Laning | Design | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 10,500. | 10,500. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | Dowse to Petone I/C | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,855,600. | 1,855,600. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | Kaitoke Existing Alignment Upgrade Realign | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 2,400. | 2,400. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | Mackays Crossing | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 21,000. | 21,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | Rimutaka Corner Easing (Muldoon's) | Design | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 33,000. | 33,000. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | SH2/58 Grade Separation | Investigation | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 18,200. | 18,200. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | Wellington Inner City Bypass Stg 2. | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 88,800. | 88,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Seal extension | Northland Highway & Network Operations | Waitiki Landing to Cape Reinga SE Stg 2 | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 307,800. | 307,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | System use studies | Waikato Highway & Network Operations | Ohinewai - Cambridge Strategy | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,700. | 1,700. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | AHB Moveable Lane Barrier Replacement | Construction | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 54,800. | 54,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | ATMS Stage IV | Construction | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 336,600. | 336,600. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | ATMS Stage IV | Design | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 61,100. | 61,100. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | Northern Motorway TDM (Ramp Signalling) | Construction | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 279,700. | 279,700. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | Northwestern Motorway TDM (Ramp Signalling) | Construction | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 469,800. | 469,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | Southern Motorway TDM | Construction | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 658,600. | 658,600. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | WRR Ramp Signalling | Construction | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 87,800. | 87,800. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | WRR Ramp Signalling | Design | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 20,600. | 20,600. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | National Office Highway & Network Operations | Toll Systems Project | Design | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 22,300. | 22,300. | |
| SH5 Adjustments from 2007/08 | Cost / Scope adjustment | Traffic management | National Office Highway & Network Operations | Toll Systems Project - Stage 1 | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,000,200. | 1,000,200. |