Download this table as a spreadsheet (Excel, 176 KB)
| Review Name | Request Type | Work category | Org Name | Project Name | Phase Type | Profile | Decision | Reason | Total cost change | NLTA share change | Condition |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Supplementary Claims Review 08/09 | New approval | Bridge renewals | Wellington City Council | Advance Fees | Design | LM | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | 106,000. | ||
| Supplementary Claims Review 08/09 | New approval | System use studies | Nelson City Council | Parking Management Study | Study | Declined | The requirements of section 20 of the Land Transport Management Act 2003 have not been met. Further details regarding the reasons can be accessed on LTP online or by request | ||||
| Supplementary Claims Review 08/09 | New approval - emergency works | Emergency reinstatement | Buller District Council | Emergency Works, Karamea Bluffs, 2 Nov 2008 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 96,000. | 96,000. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Associated improvements | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -49,897. | -23,451.59 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Associated improvements | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -21. | -10.71 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Associated improvements | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -74,951. | -32,228.93 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Associated improvements | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -100,000. | -50,000. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Associated improvements | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -1,505,610. | -1,505,610. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Associated improvements | South Taranaki District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 150,000. | 75,000. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Bridge renewals | Masterton District Council | Manawa No3 Bridge | Investigation | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 25,000. | 16,250. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Bridge renewals | Thames-Coromandel District Council | Koputauaki Bridge (Colville) | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,341. | 1,771. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Bus and ferry infrastructure | Greater Wellington | Minor Station Imp. - Epuni Rail Shelters | Construction | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 7,900. | 4,740. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Bus and ferry infrastructure | Greater Wellington | Minor Station Imp. - Waterloo Carpark Lighting | Construction | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,070. | 642. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community advertising | Auckland Regional Transport Authority | Road Safety Advertising | Implementation | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 4,977. | 3,733. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community advertising | Auckland Regional Transport Authority | TDM 08_09 Workplace Travel Plans | Implementation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -19,684. | -14,763. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community advertising | Central Otago District Council | 2008/09 CODC & QLDC Community Advertising | Implementation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | -656. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community coordination | Auckland Regional Transport Authority | Community Funding, Walking/Cycling &Road Safety Coordination | Implementation | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 10,167. | 7,625. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community coordination | Central Otago District Council | 2008/09 CODC & QLDC Joint Community Coordination | Implementation | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 4,217. | 3,163. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community coordination | Hutt City Council | Community coordination | Implementation | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 982. | 737. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community coordination | Upper Hutt City Council | Road Safety Community Co-ordination 2008-09 | Implementation | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 557. | 418. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community programmes | Auckland Regional Transport Authority | Regional Road Safety Small Project Fund | Implementation | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -10,167. | -7,625. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community programmes | Auckland Regional Transport Authority | TDM 08_09 Workplace Travel Plans | Implementation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 19,684. | 14,763. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community programmes | Auckland Regional Transport Authority | TDM Outer Regional Cycling Maps & Social Marketing | Implementation | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -4,977. | -3,732. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community programmes | Central Otago District Council | 2008/09 CODC & QLDC Joint Community Programmes | Implementation | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 4,211. | -23,292. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community programmes | Hutt City Council | Community Programmes | Implementation | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,659. | 1,244. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Community programmes | Upper Hutt City Council | Driver Improvement/Awareness 2008-09 | Implementation | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 720. | 540. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Cycle facilities | Porirua City Council | Plimmerton Station to Pascoe Ave Cycleway | Construction | HMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 21,000. | 11,340. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Cycle path maintenance | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -921. | -432.87 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Cycle path maintenance | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -29,993. | -12,896.99 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Cycle path maintenance | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -31,000. | -15,810. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Cycle path maintenance | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -48,110. | -48,110. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Cycle path maintenance | Wellington City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 82,128. | 35,315.04 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -59,520. | -27,974.4 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | Auckland City Council | Maintenance Programme 2008/09 | Local Roads | Approved in part with conditions | 4,000,000. | 1,720,000. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 6,267. | 3,196.17 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 1,011,939. | 435,133.77 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 44,155. | 26,493. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | Clutha District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -1,958. | -1,860.1 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -90,100. | -45,050. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 53,760. | 53,760. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 135,498. | 58,264.14 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | South Taranaki District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 48,000. | 24,000. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Drainage renewals | Waitakere City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 142,499. | 61,274.57 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Auckland Highway & Network Operations | EW Newton Rd Westbound Offramp Auckland Jul 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -280,400. | -280,400. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Auckland Highway & Network Operations | EW Tristram Ave Offramp Auckland South Apr 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -21,200. | -21,200. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | BOP Highway & Network Operations | EW (3831) Flood & Earthquake Event BOP R4 Jul 04 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 2,000. | 2,000. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | BOP Highway & Network Operations | EW SH29 Oropi RAB Slip 30 Jun 07 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -900. | -900. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | BOP Highway & Network Operations | EW Water Main Washout Tauriko West 18 Sep 07 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -123,900. | -123,900. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Canterbury Highway & Network Operations | (E) West Coast April09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 121,800. | 121,800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Canterbury Highway & Network Operations | EW SH7/73 Rainfall North Canterbury Feb 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -32,500. | -32,500. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Canterbury Highway & Network Operations | EW Snow/Ice North Canterbury Jun-Aug 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 47,700. | 47,700. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Far North District Council | E/W 26th-28th July 2008 : Various sites | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 23,272. | 19,316. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Gisborne Highway & Network Operations | EW SH35 Storm 29 Jun 07 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 300. | 300. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Manawatu/Wanganui Highway & Network Operations | EW East Wanganui 07/08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 800. | 800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Manawatu/Wanganui Highway & Network Operations | EW East Wanganui Storm Events Jul & Aug 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -16,800. | -16,800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Manawatu/Wanganui Highway & Network Operations | EW West of Hohitaka Rd West Wanganui | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -9,200. | -9,200. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Marlborough Highway & Network Operations | EW Marlborough 08/09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,800. | 3,800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Otago Highway & Network Operations | EW Pipson Creek Makarora Flood Event 27 Apr 09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -11,900. | -11,900. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Southland District Council | Papatotara Coast Storm Damage | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 105,000. | 57,750. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Tararua District Council | E/Works 08/09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 52,299. | 37,132. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Tasman District Council | E/Works 08/09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 744. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Tasman District Council | E/Works SPR 08/09 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1. | 1. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Tasman Highway & Network Operations | EW SH 60 Eureka Bend Slump | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 29,700. | 29,700. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW (08/011/3) SH23 Raglan Rd Jul & Aug 07 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 22,800. | 22,800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW (08/012/3) Tangitu Underslip Aug 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 2,100. | 2,100. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW (08/023/3) CW Various Slips and Flooding 3-6 Aug 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -400. | -400. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW (08/024/3) CW SH1&30 Storm Event 4 Aug 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -56,500. | -56,500. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW (08/025/3) CW SH30 Barryville Slump 6 Aug 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -145,900. | -145,900. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW (30/3881) EW Minor Events 05/06 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -1,000. | -1,000. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW CW SH1 Tirau Over Bridge Slip Jul 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -119,800. | -119,800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW CW SH30 Ongaroto Road Rockfall Aug 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -29,400. | -29,400. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW CW Snow & Ice Clearing SH1 May & June 09 09/005/3 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -2,300. | -2,300. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW EW Event Apr 06 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 10,600. | 10,600. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW EW Event Apr 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -2,700. | -2,700. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Waikato Highway & Network Operations | EW SH25 Tararu Tree Removal 09/007/3 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -55,400. | -55,400. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Wanganui District Council | E/Works 06/07 Carry Over | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -80,000. | -68,800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Wanganui District Council | E/Works Ngaturi Bridge Carry Over | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -398,000. | -342,280. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Wellington Highway & Network Operations | EW Region 9 Wellington 06/07 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -168,600. | -168,600. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | West Coast Highway & Network Operations | EW Flood Damage & Slips West Coast Nov 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -3,500. | -3,500. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | West Coast Highway & Network Operations | EW Flood Damage West Coast Dec 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -4,900. | -4,900. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | West Coast Highway & Network Operations | EW West Coast Aug 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 51,700. | 51,700. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | West Coast Highway & Network Operations | EW West Coast Jun & Jul 08 | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -5,400. | -5,400. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Whangarei District Council | E/W 10 July 2007 : Various sites | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 7,730. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Whangarei District Council | E/W 26th-30th July 2008 : Various sites | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 65,831. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Whangarei District Council | E/W 28 July 2007 : Various sites | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 61,653. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Whangarei District Council | E/W 28-29 March 2007 : Various sites | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 15,028. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Emergency reinstatement | Whangarei District Council | E/W 4-5 March 2009: Various Sites | Construction | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 0. | 2,625. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 94,266. | 44,305.02 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Carterton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 122,786. | 63,848.72 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 71,691. | 36,562.41 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 201,711. | 86,735.73 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 329,754. | 197,852.4 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Clutha District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 44,103. | 41,897.85 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 23,983. | 12,231.33 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 155,145. | 77,572.5 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Hurunui District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 9,560. | 9,560. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Manukau City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 324,927. | 139,718.61 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 2,835,410. | 2,835,410. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 290,467. | 124,900.81 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | South Taranaki District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 53,000. | 26,500. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Southland District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 555,700. | 300,078. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Tasman District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 411,600. | 201,684. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Wairoa District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 30,000. | 19,800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Waitakere City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 3,043. | 1,308.49 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Wanganui District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 254,000. | 157,480. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental maintenance | Wellington City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 332,434. | 142,946.62 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental renewals | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -25,000. | -10,750. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental renewals | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -117,598. | -70,558.8 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental renewals | Hurunui District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 7. | 7. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Environmental renewals | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -227,190. | -227,190. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 50,604. | 50,604. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -22,551. | -22,551. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 21,968. | 21,968. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 1,409. | 1,409. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 16,830. | 16,830. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Papakura District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,549. | 3,549. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Selwyn District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 78,304. | 78,304. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | South Taranaki District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 4,000. | 4,000. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Waimakariri District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 58,427. | 58,427. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Waipa District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 15,843. | 15,843. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Level crossing warning devices | Wellington City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 12,432. | 12,432. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Minor improvements | Hutt City Council | Minor improvements 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,587. | 2,045. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Minor improvements | Manukau City Council | Minor improvements 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 132,321. | 70,130. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Minor improvements | Porirua City Council | Minor improvements 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 189,834. | 102,510. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Minor improvements | Waitaki District Council | Minor improvements 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 37,587. | 25,183. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 150. | 70.5 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 4,950. | 2,524.5 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 21,037. | 9,045.91 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 26,093. | 15,655.8 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Clutha District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,382. | 3,212.9 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 304,312. | 155,199.12 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -54,271. | -27,135.5 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Manukau City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 263,576. | 113,337.68 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Marlborough District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 90,000. | 41,400. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 4,030,780. | 4,030,780. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 216,722. | 93,190.46 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Rodney District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 763,493. | 366,476.64 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | South Taranaki District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 100,000. | 50,000. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | South Wairarapa District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 51,363. | 51,363. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Southland District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 288,521. | 155,801.34 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Taupo District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 49,255. | 21,179.65 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Network and asset management | Waitakere City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 359,011. | 154,374.73 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | New roads and structures | Kapiti Coast District Council | Western Link Road | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -125,982. | -60,471. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | New roads and structures | Waikato Highway & Network Operations | Huntly Bypass (SH01N) | Investigation | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,700. | 3,700. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Operational traffic management | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -2,091. | -982.77 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Operational traffic management | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 19,192. | 8,252.56 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Operational traffic management | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -10,172. | -5,187.72 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Operational traffic management | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 6,330. | 6,330. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Operational traffic management | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -51,183. | -22,008.69 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Operational traffic management | Waitakere City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 39,401. | 16,942.43 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Operational traffic management | Wellington City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 188,548. | 81,075.64 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Pavement rehabilitation | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -408,561. | -192,023.67 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Pavement rehabilitation | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 1,335,506. | 574,267.58 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Pavement rehabilitation | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -170,749. | -102,449.4 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Pavement rehabilitation | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 46,990. | 23,495. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Pavement rehabilitation | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,189,030. | 1,189,030. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Pavement rehabilitation | Rodney District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 1,071,125. | 514,140. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Pavement rehabilitation | Waipa District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 137,550. | 66,024. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Preventive works | Southland District Council | Stewart Island Coastal Protection | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 35,000. | 18,900. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Preventive works | Wellington City Council | Preventative Maintenance | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 181,372. | 77,990. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Property management | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -479,200. | -479,200. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Ashburton District Council | Road widening Northpark Rd | Construction | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 5,745. | 3,275. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Auckland Highway & Network Operations | Greenlane East Interchange | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -315,700. | -315,700. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Kaipara District Council | Pouto Road North - Maxwell/Redhill & Heawa/Charity Hill (RD) | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -179,000. | -179,000. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Kaipara District Council | Pouto Road South (at six separate locations) | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 178,000. | 178,000. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Nelson Highway & Network Operations | SH6 Whangamoa South Realignment | Investigation | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -12,300. | -12,300. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Palmerston North City Council | Pavement smoothing 2008/2009 | Construction | MMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 16,733. | 9,370. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Selwyn District Council | Waddington Intersection Ugrade | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 31,989. | 18,554. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Waikato Highway & Network Operations | Hamilton Bypass (SH01N) | Investigation | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 2,600. | 2,600. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Waikato Highway & Network Operations | Maramarua Deviation (SH2) | Investigation | HML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -2,900. | -2,900. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Waimakariri District Council | Tram Road Intersection and Widening Improvements | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 54,278. | 32,024. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | Kaitoke Existing Alignment Upgrade Realign | Construction | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -13,400. | -13,400. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | Plimmerton to Mana | Construction | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 8,100. | 8,100. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road reconstruction | Wellington Highway & Network Operations | SH2/58 Grade Separation | Investigation | MML | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 3,200. | 3,200. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Road studies | Rangitikei District Council | Crash reduction study | Study | MM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 21,000. | 15,750. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 1,501. | 705.47 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 15,259. | 7,782.09 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 618,315. | 265,875.45 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 307,084. | 184,250.4 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Clutha District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -3,659. | -3,476.05 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Gisborne District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 75,000. | 44,250. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 186,345. | 95,035.95 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 219,895. | 109,947.5 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Hurunui District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -287. | -287. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Manukau City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 116,335. | 50,024.05 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 887,190. | 887,190. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -47,364. | -20,366.52 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | South Taranaki District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 220,000. | 110,000. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Southland District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 113,919. | 61,516.26 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Waitakere City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 42,704. | 18,362.72 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Routine drainage maintenance | Wellington City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 102,942. | 44,265.06 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 373,217. | 175,411.99 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 21,342. | 10,884.42 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -1,258,374. | -541,100.82 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 311,561. | 186,936.6 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Clutha District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 16,975. | 16,126.25 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Gisborne District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 149,000. | 87,910. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -418,305. | -213,335.55 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -50,740. | -25,370. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Hurunui District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 8,804. | 8,804. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Masterton District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 24,560. | 13,508. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 9,869,490. | 9,869,490. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 320,393. | 137,768.99 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Southland District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 554,020. | 299,170.8 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Waimakariri District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 73,870. | 36,196.3 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Wanganui District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 171,000. | 106,020. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Wellington City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 229,963. | 98,884.09 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed pavement maintenance | Whangarei District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 274,339. | 142,656.28 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 100,902. | 47,423.94 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -59,124. | -30,153.24 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 1,343,170. | 577,563.1 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -273,015. | -163,809. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | Clutha District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -19,490. | -18,515.5 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -3,650. | -1,825. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -9,062,350. | -9,062,350. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 400,474. | 172,203.82 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | Southland District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 153,168. | 82,710.72 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Sealed road resurfacing | Waitakere City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 281,821. | 121,183.03 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures component replacements | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -34,818. | -16,364.46 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures component replacements | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -54. | -27.54 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures component replacements | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -51,225. | -22,026.75 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures component replacements | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 207,231. | 124,338.6 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures component replacements | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -67,757. | -33,878.5 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures component replacements | Hurunui District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -1,000. | -1,000. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures component replacements | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 545,190. | 545,190. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures component replacements | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -204,115. | -87,769.45 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 49,497. | 23,263.59 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 1,062. | 541.62 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 149,348. | 64,219.64 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 177,761. | 106,656.6 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | Clutha District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 168. | 159.6 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | Far North District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 69,914. | 39,151.84 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 22,235. | 11,339.85 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -10,500. | -5,250. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | Hurunui District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -1,177. | -1,177. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -2,495,640. | -2,495,640. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Structures maintenance | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 54,272. | 23,336.96 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Super gold card | Environment Bay of Plenty | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 4,201. | 4,201. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Super gold card | Greater Wellington | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 110,111. | 110,111. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Super gold card | Northland Regional Council | Supergold Card Trip Payment Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 7,381. | 7,381. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Super gold card administration | Northland Regional Council | Supergold Card Administration Allocation | Construction | LLL | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -5,032. | -5,032. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | System use studies | Hawkes Bay Highway & Network Operations | Strategic Studies - Hawkes Bay | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -2,500. | -2,500. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | System use studies | Kapiti Coast District Council | Kapiti Central Traffic Model Update | Study | HMH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 23,386. | 12,395. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | System use studies | Waikato Highway & Network Operations | Ohinewai - Cambridge Strategy | Investigation | MMM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -6,300. | -6,300. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | Northwestern Motorway TDM (Ramp Signalling) | Construction | HHH | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 91,700. | 91,700. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic management | Auckland Highway & Network Operations | WRR Ramp Signalling | Design | HHM | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 139,800. | 139,800. | |
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 162,198. | 76,233.06 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -67,251. | -34,298.01 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -648,340. | -278,786.2 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 47,117. | 28,270.2 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Clutha District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 2,877. | 2,733.15 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Far North District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 70,579. | 39,524.24 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Gisborne District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 36,000. | 21,240. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 349,120. | 178,051.2 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 10,640. | 5,320. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Hurunui District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -580. | -580. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Manukau City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 176,012. | 75,685.16 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Marlborough District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 70,000. | 32,200. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Matamata-Piako District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 64,900. | 31,152. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 1,313,950. | 1,313,950. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 27,827. | 11,965.61 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Papakura District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 20,000. | 8,800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Southland District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 117,559. | 63,481.86 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Tasman District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 132,880. | 65,111.2 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Taupo District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 40,245. | 17,305.35 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Waipa District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 40,000. | 19,200. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Waitakere City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 174,112. | 74,868.16 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Wanganui District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 76,000. | 47,120. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services maintenance | Wellington City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 59,615. | 25,634.45 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services renewals | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -61,445. | -28,879.15 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services renewals | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 191. | 97.41 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services renewals | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 856,899. | 368,466.57 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services renewals | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -2,056. | -1,233.6 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services renewals | Clutha District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 16,781. | 15,941.95 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services renewals | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 38,379. | 19,189.5 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services renewals | Hurunui District Council | Maintenance Programme 2008/09 | SPR | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -1,631. | -1,631. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services renewals | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -3,534,720. | -3,534,720. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Traffic services renewals | North Shore City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -94,084. | -40,456.12 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -51,075. | -24,005.25 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 48,968. | 24,973.68 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -387,454. | -166,605.22 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -174,950. | -104,970. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | Hastings District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -16,484. | -8,406.84 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -15,702. | -7,851. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | National Office Highway & Network Operations | Maintenance Programme 2008/09 | State Highways | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | -5,360. | -5,360. | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | Southland District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 32,848. | 17,737.92 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | Tasman District Council | Maintenance Programme 2008/09 | SPR | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 29,480. | 29,480. | . |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed pavement maintenance | Wairoa District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 30,000. | 19,800. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed road metalling | Ashburton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 44,672. | 20,995.84 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed road metalling | Central Otago District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 10,946. | 5,582.46 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed road metalling | Christchurch City Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 19,536. | 8,400.48 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed road metalling | Clutha District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | -270,917. | -162,550.2 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed road metalling | Hurunui District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 40,843. | 20,421.5 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed road metalling | Kaipara District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 49,000. | 29,400. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed road metalling | Marlborough District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 16,000. | 7,360. | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed road metalling | Masterton District Council | Maintenance Programme 2008/09 | Local Roads | Approved | The requirements of section 20 of the Land Transport Management Act 2003 have been met. Further details regarding the reasons can be accessed on LTP online or by request | 134,022. | 73,712.1 | ||
| Supplementary Claims Review 08/09 | Cost / Scope adjustment | Unsealed road metalling | Matamata-Piako District Council | Maintenance Programme 2008/09 | Local Roads | Approved with conditions | Provided the condition(s) have been satisfied, the requirements of section 20 of the Land Transport Management Act 2003 will be met. Further details regarding the decision can be accessed on LTP online or by request | 109,626. | 52,620.48 | For all approvals indicated as being an advance from 2009/12, a corresponding reduction is to be made to the 2009/12 programme. If you do not wish to accept this condition, then you should not claim against the increased allocation. A claim against t |
|