General documents and information
Open Days and Project Expo - October 2010
View the information panels on display at the Open Days and Project Expo.
- About the Transmission Gully project (PDF, 1.38MB)
- Wellington Northern Corridor (PDF, 556KB)
- How Transmission Gully will change traffic flows (PDF, 766KB)
- Designing Transmission Gully (PDF, 2.17MB)
- Looking after the environment (PDF, 1.96MB)
- Managing the effects of construction (PDF, 2.32MB)
- Seeking regulatory approvals (PDF, 3.73MB)
- Porirua City Council link roads (PDF, 1.73MB)
Contracts
Contract NZTA 344PN – Transmission Gully phase II investigations – planning resources
View the tender advertisement (PDF, 35 KB) for the planning resource services contract for assessments and general planning services in preparation for the possible lodging of regulatory consents.
Prospective tenderers were required to register as per the advertisement in order to obtain a full set of tender documents.
View the request for tender (RFT) (PDF, 550 KB) for the planning resource services.
This tender closed at 4.00pm Tuesday 5 May 2009 at the Tender Box, NZ Transport Agency, Level 9 PSIS House 20 Ballance Street, Wellington.
Contract NZTA 345PN – Transmission Gully phase II investigations – engineering and environmental assessments
View the tender advertisement (PDF, 90 KB) for the engineering and environmental assessment contract(s) for work to be carried out in preparation for the lodging of regulatory consents.
Prospective tenderers were required to register as per the advertisement in order to obtain a full set of tender documents.
View the request for tender (RFT) (PDF, 1.15 MB) for the engineering and environmental assessment contract(s) for work to be carried out in preparation for the lodging of regulatory consents.
View notice to tenderer No.1 (PDF, 135KB) for the above RFT.
View the revised additional services schedules for workstreams 3 and 6 (DOC, 106 KB).
This tender closed at 4.00pm Tuesday 22 April 2009 at the Tender Box, NZ Transport Agency, Level 9 PSIS House 20 Ballance Street, Wellington.
Other Documents
- Consultation report (PDF, 214 KB) on the preferred route through Transmission Gully
- Draft Scheme Assessment Report on the findings from investigatory and preliminary design work on phase 1 of the Transmission Gully project
- Key features map (PDF, 4.60 MB) published in the 11 July 2008 Dominion Post supplement illustrating the key features of the preferred route
- Information pages (PDF, 1.61 MB) published in the 11 July 2008 Dominion Post supplement
- Information brochure (PDF, 1.43 MB) delivered to all households in the Greater Wellington region (July 2008)
- Transmission Gully and SH1 coastal route (PDF, 4.67MB) a report on the route security of the two routes prepared in June 2009
- Feedback newsletter (PDF, 2.02MB)
- FAQs
- News and media releases
- Maps and images
