Displaying 321 - 330 results of 482 for ""
Published: 22 December 2005
Category:
Skid resistance & surface texture
,
Technical memoranda
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This memo advises macrotexture requirements for low speed areas and supersedes the two earlier asset management memos.
Published: 2003
Category:
Materials
,
Road marking
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes set out requirements for marking materials which have a long service life and which are typically applied at thicknesses of about 0.9 mm or more.
Published: 1993
Category:
Litter
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes sets out the requirements for the removal of roadside litter.
Published: 2012
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification ahd guidance notes apply to the purchase of calcium oxide or calcium hydroxide for use in soil stabilisation.
Published: 2003
Category:
Materials
,
Chipsealing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This method is a procedure for calculating the lighting kerosene content of cutback bitumen.
Published: 13 January 2011
Category:
Surfacings & asphalt
,
Technical memoranda
| Audiences:
Road traffic engineers & consultants,
Roading contractors
The procedure for assessing bitumens for acceptance by the penetration test shows the calculations used to set the acceptance limits shown in table 1 of M1 notes:2010.
Published: June 1975
Category:
Materials
,
Chipsealing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification for pre-coating sealing chips.
Published: 2013
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification and guidance notes for F2 Pipe Subsoil Drain Construction.
Published: December 2010
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification and guidance notes for pipe culverts including the construction of trenches; supply and placement of bedding; supply and laying of pipes; jointing of the pipes; construction of headwalls, wing-walls, aprons, drops, and intakes and outle…
Published: February 2012
Category:
Skid resistance & texture
,
Surfacing
,
Specifications
| Audience:
Roading contractors
The NZ Transport Agency has released a pilot version of the P25 Specification for calcined bauxite for trial and comment.