Chapter C3 Formulating activities and combinations of activities
C3.12 Quality of information in RLTPs
Quality of RLTP information
The organisation proposing activities and combinations of activities for inclusion in the RLTP is responsible for the quality of the information.
This includes:
- completeness
- accuracy
- timeliness
- ensuring that activity preparation complies with the NZTA's requirements and statutory requirements.
Accountability for quality of assessments
The approved organisation is responsible for the:
- accuracy, completeness and appropriateness of the data used
- assumptions made and calculations for determining the assessment of projects.
Inclusion of a project in the NLTP, and approval for funding, does not necessarily mean that the NZTA has validated the information or the assessment provided by the proposing organisation. The approval of a project means that the assessment is only verified in terms of the checklist for project evaluations - worksheet 7 from the NZTA's Economic evaluation manual, volume 1.
Conformity of submission with other plans
The NZTA expects that submitted transport programmes, packages, projects and 10-year budgets will be substantially the same as those included or referenced in the approved organisation's:
- activity management plans and annual plan, or
- LTCCP, or
- other equivalent documents.
The NZTA acknowledges that, because of differing timeframes, some variances may arise. However, these are expected to be small at the time the final submission is made.