Introduction
The following policy applies where provision of stock crossings across, under or over a road have been requested to connect two parts of a property.
Road protection where stock cross at grade
If the least long-term maintenance cost is to use a protective covering over the road (eg road/stock mats or a specialised seal coating), then this cost is eligible for funding assistance under work category 111: sealed pavement maintenance.
New road alignment
When a new road alignment severs a rural property, the roading portion of an access structure may be included as part of the total road construction cost.
Cost sharing is to be considered on the following basis:
- Where provision of a stock access structure can be made at a cost less than that involved in acquiring the severed area of land, the full cost of the access structure will be accepted as a charge to the roading improvement. This includes the value of any improvements.
- Where the cost of providing an access structure exceeds the value of the severed land, no stock access structure shall be provided. This is where the value of improvements is included and the landowner is not prepared to sell the severed land.
Note: Other options to be considered include:
- the resale or exchange of the severed land
- purchase and resale of both portions.
Existing road alignment
Where existing and proposed stock movements on an existing road significantly affects road traffic, a proportion of the cost of constructing a stock access structure (including fees) will be accepted as a roading cost.
Where existing and proposed stock movements on an existing road significantly affects road traffic, a proportion of the cost of constructing a stock access structure (including fees) will be accepted as a roading cost.
Existing roads: proportion of cost
The figure below illustrates the proportion of an access structure's cost that will be accepted as a roading cost, where the structure is to be built on an existing road alignment.
Note: Where a vehicle accident record exists, the project should be considered as a road reconstruction project. If the project has an assessment profile better or equal to the prevailing funding threshold profile, the total cost should be accepted as a roading cost.
Form of structure
The form of the stock access structure should be determined by the needs of the farmer, subject to approval of the design by the RCA.
Agreements with landowner
The NZTA requires that the RCA obtains a written undertaking from the farmer that any at grade stock crossing will be eliminated immediately on completion of the access structure.
The RCA should also consider an encumbrance to be registered against the title of the property affected by the under or overpass. For a template of an encumbrance, refer to the Road Controlling Authority Forum's Guidelines for stock crossings.
Approvals
The RCA can approve applications for projects that conform to this policy. Proposals not complying with this policy shall be referred to the NZTA for a decision.
Maintenance
Any repairs to the stock access structure may be included in work category 114: structures maintenance. However, at a minimum, the landowner will be responsible for the cost of:
- maintenance of the track through the structure
- associated drainage and fencing
- the repair of any damage to the structure caused by the farmer's use or activity.
Cost sharing for stock underpasses or overpasses
Formula for cost sharing for stock underpasses or overpasses
CS = 0.05 x AADT (on roads having less than 500 AADT) in percent
Where:
CS = 25 percent (on roads having greater than or equal to 500 AADT)
CS = RCA's contribution to the total construction cost of an access structure on an existing road (in percent)