REMINDER: SH2 Pekatahi Bridge daytime closure Mon-Wed next week

|

Those travelling on State Highway 2 between Awakeri and Taneatua from Monday (12 July) to Wednesday (14 July) next week are reminded to plan ahead and allow extra time for their journeys, due to a closure of the Pekatahi Bridge for maintenance works.

Waka Kotahi NZ Transport Agency advises the closure will be in place between 8.30am and 4.30pm, while contractors are on site to replace a section of handrail that was recently damaged. Due to the narrow width of the bridge, it needs to be closed to ensure this work can be carried out safely. The closure has been scheduled during the school holidays to minimise disruption to motorists.

There will be a detour in place for northbound traffic, using Taneatua Road, Arawa Road, Hinemoa Street and on to State Highway 30 towards Awakeri. Southbound traffic should use the same route, in reverse. This detour is expected to take 20 minutes and is suitable for High Productivity Motor Vehicles (HPMV). 

Outside work hours the road will operate as normal.

In the event of bad weather or other unforeseen circumstances, work may be postponed. Visit the interactive Waka Kotahi Journey Planner website for the latest information on roadworks, traffic, road closures and detours to help plan your trip.

Journey Planner(external link)

Waka Kotahi thanks motorists for their patience.

Plan ahead for a safe, enjoyable journey. Keep up to date with:

Tags