Archive - this information is for reference only and no longer maintained.

Introduction

This work category provides for contracted ferry public transport services that are directly part of the service-level provision agreed between the Transport Agency and Approved Organisations consistent with the Regional Public Transport Plan (RPTP ) prepared in accordance with Part 5 of the Land Transport Management Act(external link).

This definition applies to the 2012-15 NLTP.

Examples of qualifying activities

Examples of qualifying activities include, but may not be limited to:

  • management of contracts and monitoring of services, including the registration of commercial services
  • contract payments, including the costs to support Public Transport Operating Model (PTOM) commercial services development
  • concession payments for a concession fare is determined through Section 9, procurement procedure 4 of the Transport Agency’s Procurement Manual made to eligible groups of public transport users who have particular characteristics warranting special consideration
  • operational planning and changes to existing services, including:
    • frequency or service capacity variation(s) (within the limits set within the Transport Agency Procurement Manual)
    • vehicle comfort or accessibility or security systems (related specifically to on-vehicle operations only)
    • provision for people with disabilities or on-vehicle cycle and pram facilities
    • on-vehicle installation and operational costs associated with public transport technology, and
  • new services provided these are included in the adopted RPTP or are trial services agreed to by the Transport Agency
  • the management costs and overheads associated with the activities funded under this work category
    .

Other potential activities that are not in the above list of examples should be discussed with the Transport Agency for eligibility.

Exclusions

This work category excludes:

  • off-vessel operational activities covered by Work category 514: Public transport facilities operation and maintenance;
  • costs associated with the development or operations of public transport technology;
  • SuperGold free off-peak travel scheme fare reimbursements, and;
  • preparation of an RPTP, which is funded through Work Category 003: Activity Management Planning.

Funding assistance rate

The usual funding assistance rate is:

  • •50% of the Approved Organisation’s expenditure for providing the services