In 2020, working with Council, iwi, key stakeholders and the community, we completed a detailed business case for the Corridor.

Detailed business case [PDF, 6.7 MB]

In the lead up to the detailed business case, we worked closely with Rotorua Lakes Council, iwi and stakeholders to come up with a set of proposed improvements for the corridor. In late-2020, we heard valuable feedback through stakeholder and community engagement which further shaped the improvements.

Summary of the engagement process [PDF, 189 KB]

Key changes we made in late 2020 as a result of stakeholder and community feedback:

  • allowing right-turn entry into Brent Road, with right turn exit from Brent Road prohibited (we originally proposed left in/left out only at this intersection)
  • smooth transitions for cyclists and prams at intersections
  • pavement design to reduce noise for residents on the corridor
  • technology for phasing of signal lights to ensure efficient through-traffic flow
  • extending the length of the right-turning bay at the Ōwhata roundabout to allow longer queuing and reduce impacts to through-traffic
  • more pedestrian refuges.

Map of the preferred option [PDF, 84 KB]