CONTACT CENTRE WAIT TIMES: Our Contact Centre is currently experiencing significant wait times. View frequently asked questions

SCAM ALERTS: Report a phishing scam or learn about the latest phishing emails

REGO AND RUC LABEL ERROR: There was a postage error with labels purchased on the 15 August 2022. Find out more

CONTACT CENTRE WAIT TIMES: Our Contact Centre is currently experiencing significant wait times. View frequently asked questions

ROAD USER CHARGES (RUC) DISCOUNT: Find out more about the temporary RUC reduction scheme

ONLINE SERVICES: We are currently experiencing issues with all our online services at the moment. We are working to resolve the services as soon as possible. We apologise for any inconvenience caused.

COVID-19 SERVICES UPDATE: Information on Waka Kotahi services, extensions and more

ONLINE SERVICES: We currently have an issue with receiving some payments and are working to resolve this issue as quickly as possible. We apologise for any inconvenience.

EASTER WEEKEND – PLAN AHEAD: Heading away for the long weekend? Check our holiday journeys tool(external link)

SCAM ALERTS: Refund email and Vehicle licence (rego) renewal phishing emails

CONTACT CENTRE WAIT TIMES: Our Contact Centre is currently experiencing significant wait times. View frequently asked questions

CONTACT CENTRE PHONE LINES: Our Contact Centre phone lines are currently unavailable. View frequently asked questions

Resources

Displaying 1 - 10 results of 63 for ""

#22-11 Safe System audit guidelines

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This note is to advise that the Safe System audit guidelines have been updated.

#22-10 National Seismic Hazard Model and what it means for our design standards

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This note is to advise the sector, including local road controlling authorities, the position of Waka Kotahi is that the newly released National Seismic Hazard Model (NSHM) does not immediately affect Waka Kotahi issued design standards and guidance,…

#22-02 Interim technical standards for the design of timber bridges

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This note provides guidance on the technical standards that can be used for the design of a broad spectrum of timber bridges, including glue-laminated bridges.

#21-21 Update for tendering to manage cost volatility

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This note is to advise all parties to capital works tenders that temporary arrangements will be made to the tendering process because of the current industry circumstances.

#18-02 Z/44 supporting templates updated & seeking comment on the Risk Register Template

Published:
Category: Technical advice note | Audience: Roading contractors

This note advises of minor changes have been made to the Risk Management Plan template to align it with the new Z/44 minimum standard for Risk Management.

#18-05 Revision of the New Zealand Transport Agency Standard P45:2019 accidental archaeological discovery protocol (ADP)

Published:
Category: Technical advice note | Audience: Roading contractors

The previous archaeological discovery procedure (Z/22) was out of date in terms of statutory and organisational references and in regard to best practice.

#21-11 Amendment of SM014 Cost Estimation Manual

Published:
Category: Project & contract management , Technical advice note , Manuals | Audiences: Road traffic engineers & consultants, Roading contractors

This note is to advise that an amendment has been made to the Waka Kotahi NZ Transport Agency (Waka Kotahi) Cost Estimation Manual SM014 (herein referred to as ‘SM014’).

#21-14 Infrastructure Delivery Resource Efficiency Policy

Published:
Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This note is to advise that the Resource Efficiency Policy for Infrastructure Delivery and Maintenance for Waka Kotahi NZ Transport Agency has been introduced to be used on all of its future projects meeting the criteria set out in the policy.