Ngauranga Triangle strategy study

Published: | Category: Research & reports | Audience: Local & regional government

A joint study between the NZ Transport Agency, Wellington City Council and Hutt City Council that outlines an integrated long-term strategy for the Ngauranga Triangle. The Ngauranga Triangle consists of State Highway 1 between Tawa and Ngauranga, State Highway 2 between Ngauranga and Petone, and possible link between Petone and Tawa/Grenada.

The study was completed in stages. An extensive list of transportation measures for the Ngauranga Triangle was developed in the first instance, which was narrowed down to a short list. The short list options were then evaluated, culminating in recommendations that are contained in the Ngauranga Triangle technical report.

The summary of the technical report provides an overview of the processes followed by the study and its recommendations. More detail on each of the stages can be found in the Ngauranga Triangle technical report, the Short options report and the Long list assessment report.

Publication details

  • Author:
  • Published: January 2010
  • Conditions: The Ngauranga Triangle Strategic Study is a technical report, outlining potential long-term transport solutions for the Ngauranga Triangle transport network. The public release of the document means it is now available as an input into the Hutt and Western Corridor Plan reviews, which are scheduled to be undertaken by Greater Wellington Regional Council over the coming year. As a technical report, the study has not been presented to the NZ Transport Agency Board for its support, endorsement or approval. Accordingly, publication of the report does not constitute any form of commitment by the Transport Agency to the recommendations contained in this report.