Resources

Displaying 361 - 370 results of 483 for ""

#19-09 Update to NZTA M1-A specification for performance-graded asphalt binder

Published:
Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This notice advises that the new performance-graded asphalt binder specification is available to be used for all future asphaltic concrete works.

Standard safety intervention toolkit

Published:
Category: Manuals , Safety management systems | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The Standard Safety Intervention toolkit provides guidance for road safety practitioners on the effectiveness and value-for-money cost range of proven safety interventions to reduce the number of people killed and seriously injured on Aotearoa roads.

#19-01 Revision of the Code of Practice for Temporary Traffic Management (CoPTTM)

Published:
Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This notice advises that there has been a general update for the Code of Practice for Temporary Traffic Management Manual, which will come into effect from February 2019 and must be applied to all work from then.

Research Report 578 Removing barriers to the use of crumb rubber in roads

Published:
Category: Activity management , Research programme , Research & reports | Audiences: General, Roading contractors

The purpose of this research was to identify the barriers to using tyre-derived crumb rubber in bitumen binder in New Zealand roading and the methods to remove these barriers to create market demand for New Zealand waste tyre-derived products.

Research Report 577 Criteria and guidance for the design of integral bridges in New Zealand

Published:
Category: Publication Category , Research programme , Research & reports | Audiences: General, Roading contractors

The use of integral and semi-integral bridges in New Zealand is fairly common practice due to advantages in ease of construction and savings in maintenance and whole-of-life costs.

Research Report 574 Geosynthetics in basecourse stablisation

Published:
Category: Activity management , Research programme , Research & reports | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The application of geosynthetics (ie geogrids) for the stabilisation of basecourses prepared with a River Run rounded gravel aggregate was investigated.

#17-02 New Multi criteria analysis for transport business cases guidelines for consultation

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

A new document has been released for consultation with users/stakeholders to gain feedback on the Multi criteria analysis for transport business cases guidelines.

#17-01 Asphalt depths at high stress locations for new pavements and renewals

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The Austroads Guide to pavement technology part 2: pavement structural design and the associated New Zealand supplement (Transit 2007) are used to design pavements in New Zealand.

#16-19 Business case approach online modules

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

Update on the status of the NZ Transport Agency’s Business case approach capability programme.