Resources

Displaying 21 - 30 results of 89 for "#19-"

#21-14 Infrastructure Delivery Resource Efficiency Policy

Published:
Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This note is to advise that the Resource Efficiency Policy for Infrastructure Delivery and Maintenance for Waka Kotahi NZ Transport Agency has been introduced to be used on all of its future projects meeting the criteria set out in the policy.

#20-01 Procedures for design and indirect tensile strength testing of modified and bound pavement materials

Published:
Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This note is to advise that NZ Transport Agency (NZTA) Specification T19:2020, Procedures for design and indirect tensile strength testing of modified and bound pavement materials, has been released for general use and is available on the Transport A…

#21-04 Minimum standard Z19: Environmental and social responsibility – interim update 2021

Published:
Category: Environment , Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This note is to advise that the Minimum standard Z19: Environmental and social responsibility standard (ESR standard) has been updated and is available for use on the Waka Kotahi NZ Transport Agency website.

#16-07 Update to Z19 State highway environmental and social responsibility standard and guidance

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

The purpose of the Z19 State highway environmental and social responsibility standard is to explain to Transport Agency project and maintenance contract managers and their teams how and when to implement the Transport Agency’s environmental and socia…

#21-21 Update for tendering to manage cost volatility

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This note is to advise all parties to capital works tenders that temporary arrangements will be made to the tendering process because of the current industry circumstances.

#22-12 Guideline for preparing an environmental management plan

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This note is to advise that the Guideline for preparing an environmental management plan (EMP) has been published.

#20-18 Sustainability Rating Scheme Policy – update 2020

Published:
Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This note is to advise that the Sustainability Rating Scheme Policy for Waka Kotahi NZ Transport Agency has been updated to be used on all future projects meeting the Rating Scheme Policy requirements.

#21-18 Amendments to Contractor Health and Safety Expectations Guideline

Published:
Category: Technical advice note | Audiences: Road controlling authorities, Road traffic engineers & consultants, Roading contractors

This note is to advise that amendments have been made to the Waka Kotahi NZ Transport Agency “Contractor health and safety expectations: guidance for supply chain partners” document.

#21-05 State Highway Professional Services Contract Proforma Manual (SM030) Issue 9.1 and State Highway Construction Contract Proforma Manual (SM031) Issue 14.1

Published:
Category: Technical advice note | Audiences: Road traffic engineers & consultants, Roading contractors

This note is to advise of updates to the Waka Kotahi NZ Transport Agency (Waka Kotahi) State Highway Professional Services Contract Proforma Manual (SM030) and State Highway Construction Contract Proforma Manual (SM031).