Skip to content

Access keys for nzta.govt.nz

  • h Home
  • m Menu
  • 0 Show list of access keys
  • 2 Skip to content
  • 3 Skip to top

Wellington region maintenance programme

Information about roadworks in the Wellington and Kāpiti regions

Major roadworks on the region's state highways for the week Sunday 22 April – Saturday 28 April 2018 are listed below to help you plan your journey.

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. Plan ahead as roadworks on the state highway network may affect your journey times.

NOTE: Weather or other factors may cause roadworks to be postponed to the next suitable day or night.

Updates

Driving on freshly laid chipseal

Animation, long version:

Animation, short version:

Sunday 22 April – Saturday 28 April 2018

State Highway 1

 

Location

Type of work

Hours

Sun 22nd      

Mon 23rd     

Tue 24th

Wed 25th    

Thu 26th   

Fri 27th      

Sat 28th      

Vivian Street, at Cuba Street   intersection

Southbound lane   closed

Traffic signal cabling

7pm – 5.30am

 

 

 

 

Wellington urban motorway, north of Aotea Quay

Northbound lane closed

Light pole works

7pm – 5.30am

 

 

Ngauranga Flyover

Lane closed

Bridge joints repair

8.30pm – 5am

 

 

 

 

 

 

Ngauranga Gorge

Northbound lane closed

Traffic monitor cabinet replacement

7pm – 5.30am

 

 

 

 

South of Porirua

Southbound lane closed

Barrier move, Transmission Gully project

7pm – 5am

 

 

 

 

 

Paremata Bridge

Southbound lane closed

Bridge joint repair

8.30pm – 5am

 

 

 

 

 

Plimmerton Roundabout

Lanes   closed

Garden Maintenance

9am – 4pm

 

 

 

 

 

 

Pukerua Bay

Stop/go traffic control

 

Slip and crib wall repair

7pm – 5.30am

 

 

 

 

 

North of Fisherman’s Table,   Paekakariki

Altered lane layout

 

Subsoil drain construction

7pm – 5.30am

 

 

 

 

 

 

North of Paekakariki

Altered lane layout

Transmission Gully project

24/7

   √

Old SH1,Paraparaumu

Caution, side street closed for Anzac events

Anzac Parade

4am -6pm

 

 

 

 

 

 

Old SH1, Otaihanga

Stop/go traffic control

Pavement repair

8am – 4.30pm

 

 

 

 

 

 

Kāpiti Expressway, south of Waikanae

Southbound lane closed

Asphalt paving

8am -4.30pm

 

 

 

 

 

North of Kāpiti Expressway to Te Horo

Altered lane layout

Drain clearing

8.30am- 4pm

 

 

 

 

 

 

South of Te Horo

Altered lane layout

Guardrail repair

7pm – 5.30am

 

 

 

 

 

 

Te Horo

Altered lane layout

Vegetation control

8.30am- 4pm

 

   √

 

 

Ōtaki North

Altered lane layout

Vegetation control

8.30am - 4pm

 

 

   √  

 

 

Manakau

Prepare to stop on request

Tree-felling

7am -4pm

 

 

 

 

Manakau to Kuku

Stop/go traffic control

Line-marking

7pm – 5.30am

 

 

 

 

 

 

State Highway 2

Location

Type of work

Hours

Sun 22nd      

Mon 23rd     

Tue 24th

Wed 25th    

Thu 26th   

Fri 27th      

Sat 28th      

Melling, south of the bridge

Lane closure

Median   barrier repair

7pm – 5.30am

 

 

 

 

 

 

North of Haywards interchange

Lane closure

Line-marking

7pm – 5.30am

 

 

 

 

South of Silverstream

Southbound lane closure

Railway barrier   upgrade

9am -4pm

 

 

 

 

 

 

Kaitoke lookout

Stop/go traffic control

 

Guardrail   repair

7pm – 5.30pm

 

 

 

 

 

 

 

State Highway 58

 

Location

Type of work

Hours

Sun 22nd      

Mon 23rd     

Tue 24th

Wed 25th    

Thu 26th   

Fri 27th      

Sat 28th      

Judgeford to Mount Cecil Road

Stop/go traffic control

Subsoil analysis

7pm – 5.30am

 

 

 

 

 

 

Haywards Hill, north of interchange

Stop/go traffic control

Drain clearing

7pm – 5.30am

 

 

 

 

 

 

Haywards Hill, interchange to water reservoir

Stop/go traffic control

Removing excess bitumen

7pm – 5.30am

 

 

 

 

Top