No results found

Positive Safety Initiative - four way cable

19 Dec 2016

During early stages of the project there was an issue around suitable cable rollers to pull the hundreds of kilometers of cables required for the...

Positive Safety Initiative - Low Level Access

14 Dec 2016

The team installing the signage in the tunnel needed to access various locations along the tunnel above the barrier. As standing on the barriers was...

Positive Safety Initiative - Bridge Column

14 Dec 2016

The Shared Path Team had the opportunity to eliminate working at height during the assembly of the super structures for the bridge columns. The assembly...

Positive Safety Initiative - Floor Gate

22 Nov 2016

One of our workers recognised an ergonomic hazard when he was assigned the task of lifting the green plastic grating in the Cross Passages Electrical...

Positive Safety Initiative - Waterview Hydro Excavation Box

22 Nov 2016

The hydro demolition works on Oakley Creek Bridge used high pressure water at 32K psi to break out sections of the concrete deck. This was...

Ruptured Line

22 Sep 2016

Pioneer Pumps were engaged to pump 100m3 concrete into floor of north bound sump. A boom pump was set up and a 3 inch steel...

Motor vehicle accident involving truck mounted attenuator

9 May 2016

On 13 November 2015 a sub-contractor was tasked with removing vegetation from the side of the road using an Elevated Work Platform (EWP) on a...

11Kv strike

9 May 2016

The utility owner (electricity supply) sent one of their contractors to string cable through previously laid ducts for streetlights. During the process they encountered difficulty...