Displaying 71 - 80 results of 521 for ""
Published: 1995
Category:
Construction
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Q/3 Normal QA level contract specification covers the quality assurance requirements for contracts which have been assessed at the normal quality assurance level.
Published: 2000
Category:
Application
,
Road marking
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification and guidance notes apply to the reflectorised and non-reflectorised marking of sealed and paved road surfaces in paint, thermoplastic and other types of road marking materials.
Published: 13 January 2011
Category:
Surfacings & asphalt
,
Technical memoranda
| Audiences:
Road traffic engineers & consultants,
Roading contractors
The procedure for assessing bitumens for acceptance by the penetration test shows the calculations used to set the acceptance limits shown in table 1 of M1 notes:2010.
Published: June 1975
Category:
Materials
,
Chipsealing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification for pre-coating sealing chips.
Published: 2013
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification and guidance notes for F2 Pipe Subsoil Drain Construction.
Published: December 2010
Category:
Construction
,
Pavement & surfacing
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Specification and guidance notes for pipe culverts including the construction of trenches; supply and placement of bedding; supply and laying of pipes; jointing of the pipes; construction of headwalls, wing-walls, aprons, drops, and intakes and outle…
Published: 2006
Category:
Unsealed pavements
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
HM23 Unsealed pavements replaces specifications TNZ C11, C12, C13 and C14.
Published: 2006
Category:
Service covers
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification, HM15 Service covers, replaces specification TNZ C8 Specification for adjusting service covers.
Published: 2006
Category:
Potholes
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification sets out the requirements for the repair of potholes in bituminous surfaced roads and bridge decks.
Published: 2006
Category:
Operations
,
Maintenance
,
Specifications
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This specification replaces specification TNZ C9 Specification for emergency work.