Displaying 111 - 120 results of 141 for ""
Published: 29 November 2022
Category:
Technical advice note
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
This note is to advise that the Guideline for preparing an environmental management plan (EMP) has been published.
Published: 30 April 2020
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This note is to advise that there is an issue with the use of sonic drilling as an investigation technique in the North Island and, as a result, this methodology must not be used unless its suitability for the works as designed is agreed with the roa…
Published: 29 May 2020
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This note is to advise that issue 11 of the Waka Kotahi NZ Transport Agency State Highway Maintenance Contract Proforma Manual (SM032) has been released to be used for all future procurement of infrastructure projects and is available for download fr…
Published: 29 May 2020
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This note is to advise that the third edition of the Waka Kotahi NZ Transport Agency Contract Procedures Manual (SM021) has been released to be used for all future procurement of infrastructure projects and is available for download from the Waka Kot…
Published: 29 May 2020
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
A new version of the SM012 manual is now available to assist practitioners involved in state highway corridor management to carry out their day to day tasks.
Published: 14 February 2020
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This notice advises that the latest changes to the Prequalification for physical works information pack are available to assist suppliers and project managers to more easily apply the prequalification protocols.
Published: 23 December 2019
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This notice advises that the NZ Transport Agency has recently become aware of electrical issues in some of the traffic signals controllers, managed within one of our maintenance contracts.
Published: 22 August 2019
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
The purpose of this note is to advise project and network managers that there has been an update to the State highway construction and maintenance noise and vibration guide.
Published: 21 July 2021
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Contractors who want to achieve or maintain prequalification need to be aware that Waka Kotahi NZ Transport Agency has made changes to the Physical Works Prequalification Pack.
Published: 13 April 2021
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This note is to advise of updates to the Waka Kotahi NZ Transport Agency (Waka Kotahi) State Highway Professional Services Contract Proforma Manual (SM030) and State Highway Construction Contract Proforma Manual (SM031).