Displaying 31 - 40 results of 141 for ""
Published: 15 September 2021
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This note is to advise that the Resource Efficiency Policy for Infrastructure Delivery and Maintenance for Waka Kotahi NZ Transport Agency has been introduced to be used on all of its future projects meeting the criteria set out in the policy.
Published: 15 September 2021
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This note confirms and refines the approval process and design requirements for geosynthetics used on Waka Kothi NZ Transport Agency (Waka Kotahi) projects.
Published: 15 September 2021
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
Withdrawn.
Published: 17 August 2021
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This note is to advise that an amendment has been made to the third edition of the Waka Kotahi NZ Transport Agency (Waka Kotahi) Manual SM021, Contract Procedures Manual.
Published: 29 June 2017
Category:
Technical advice note
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
The assessment of business case materials will help guide conversations between NZ Transport Agency staff and investment partners so the right conversations can be had at the right stage of the process.
Published: 31 May 2017
Category:
Technical advice note
| Audiences:
Road controlling authorities,
Road traffic engineers & consultants,
Roading contractors
CoPTTM describes best practice for the safe and efficient management and operation of temporary traffic management (TTM) on all roads in New Zealand.
Published: 6 August 2019
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This technical advice note outlines interim requirements for the use of mechanical reinforcement couplers and anchors, subsequent to the publication of the Bridge manual 3rd edition amendment 3.
Published: 24 June 2019
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This notice advises that the new performance-graded asphalt binder specification is available to be used for all future asphaltic concrete works.
Published: 20 February 2019
Category:
Technical advice note
| Audiences:
Road traffic engineers & consultants,
Roading contractors
This notice advises that there has been a general update for the Code of Practice for Temporary Traffic Management Manual, which will come into effect from February 2019 and must be applied to all work from then.
Category: Technical advice note | Audiences: Certifiers, Heavy vehicle operators
This information is for those buying steel and fabricating vehicle structures and components, particularly those regulated to be certified and in accordance with welding requirements of AS/NZS 1554.